Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Site Supervision for Works – Belgrade Centre Railway Station
Ministarstvo građevinarstva, saobraćaja i infrastrukture
posle izbora
Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.
Šta možete da uradite
Vrsta akta još nije određena. Pogledajte katalog akcija.
Ključni podaci
- Oblast
- Građevinarstvo, saobraćaj, infrastruktura
- Vrsta dokumenta
- Konkurs, oglas
- Datum
- 2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)
Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.
Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
- resor iz izvora: infrastruktura
Prilozi (2)
- Contract Award Notice SER-SRSM-QCBS-CS-24-66.pdf · arhiva · 2.260 znakova
Izvučeni tekst
Contract Award Project: P170868-Serbia Railway Sector Modernization Loan/Credit/TF Info: IBRD-92210 Bid/Contract Reference No: SER-SRSM-QCBS-CS-24-66 Procurement Method: QCBS-Quality And Cost-Based Selection Scope of Contract: Site Supervision on reconstruction and expansion of the Belgrade Centre railway station Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2026/04/29 Duration of Contract 18 Month(s) Minimum Qualifying Score 80 Awarded Firm(s): PROJECT BIRO UTIBER (609530) Temerinska 76, Novi Sad Country: Serbia Beneficial Ownership Details Form Date: 27-NOV-23 Name Nationality Residence Country Conditions Met Alamassy Laszlo HU Hungary Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent, Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights Lakits Gyorgy HU Hungary Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights UTIBER KÖZÚTI BERUHÁZÓ KFT. (735579) Country: Hungary Beneficial Ownership Details Form Date: 27-NOV-23 Name Nationality Residence Country Conditions Met Almassy Laszlo HU Hungary Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent Lakits Gyorgy HU Hungary Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights Scores Technical: 94.70 Consultant Specific Experience: 9.77 Methodology: 18.74 Key Personnel: 66.19 Financial: 57.97 Combined: 87.35 Rank: 1 Final Evaluation Price RSD 135622707.47 Signed Contract Price EUR 1390804.80 Price: Currency: Amount: Euro (Euro) 1390804.80 Evaluated Firm(s): EGIS D.O.O. BEOGRAD (639391) Country: Serbia EGIS POLAND SP. Z O.O. (735570) Country: Poland EGIS RAIL (431493) Country: France EGIS BATIMENTS INTERNATIONAL (525719) Country: France Final Evaluation Price RSD 78622283.37 Price: Currency: Amount:
- REoI-ToR-SER-SRSM-QCBS-CS-24-66.pdf · arhiva · 64.130 znakova
Izvučeni tekst
REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Site Supervision on reconstruction and expansion of the Belgrade Centre railway station Reference No. SER-SRSM-QCBS-CS-24-66 The Republic of Serbia has received a Loan from the International Bank for Reconstruction and Development (IBRD) in the amount of EURO 51 million and from the Agence Francaise de Développement (AFD) in the amount of EURO 51 million, toward the cost of the Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA) and intends to apply part of the proceeds to payments for consulting services for Site Supervision on reconstruction and expansion of the Belgrade Centre railway station The consulting services (“the Services”) include are divided into three activities: − Activity 1: Inception report; − Activity 2: Support during tender procedure − Activity 3: Supervision of works Activity 1: The Inception Report shall be the specific output of the Inception Period and present an overall approach and detailed program work plan and completion schedule for the services. It should discuss constraints and challenges identified by the Consultant and ways to address them in order to timely and effectively deliver the assignment. Activity 2: The Consultant shall provide technical and operational support to the Client and assist in bidding, bids evaluation, contract finalization to facilitate the timely and effective selection of the Contractor. Within this activity, the Consultant will be involved as an observer in the selection process to ensure compatibility with tender criteria and requirements and achieve agreed project objectives and results. Activity 3: The Consultant shall provide full supervisory services during construction and installation works by the Contractor, who will be engaged in accordance with WB contract conditions. Contract duration: 14 months starting from the commencement date, but no later than 31 December 2026, as Project completion date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI): https://www.mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-site- supervision-works-belgrade-centre The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 2017, August 2018 and November 2020). The Client intends to shortlist up to eight eligible firms to whom a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. The consulting firms/JV that will submit EoI shall possess the following experience and qualifications: i) Experience in supervision of works on construction/reconstruction of public facilities • Minimum one (1) supervision contract for works on construction or reconstruction of the public facility. As public facility is considered facilities like schools, hospital, residential buildings, railway, bus or metro stations, airports etc. The reference supervi
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Site Supervision for Works – Belgrade Centre Railway Station Dokumenti: Contract Award Notice SER-SRSM-QCBS-CS-24-66.pdf REoI-ToR-SER-SRSM-QCBS-CS-24-66.pdf
Povezani akti (8)
- Request for Quotation (RFQ) Purchasing of SUV Vehicle and Mid-size/large car (D-segment) for PIU for LIID · 2.11.2026.
- ODLUKA O SPROVOĐENJU POSTUPKA ZA DODELU SREDSTAVA KAO STIMULATIVNIH MERA PUTEM JAVNOG POZIVA ZA UNAPREĐENJE KOMBINOVANOG TRANSPORTA ZA 2024. GODINU · 9.9.2024.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – TECHNICAL ASSISTANCE FOR MAINTENANCE OUTSOURCING CONTRACT · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – CREWS SCHEDULING INFORMATION SYSTEM FOR SRBIJAVOZ · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – ESIA FRAMEWORK AGREEMENT · 2.11.2026.
- WESTERN BALKANS TRADE AND TRANSPORT FACILITATION PROJECT (WBTTF) – DESIGN, SUPPLY AND INSTALLATION OF NATIONAL SINGLE WINDOW SYSTEM · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE · 2.11.2026.