Sajt nastaje poluautomatski: AI prikuplja akte i predlaže ocene, a tim ljudi ih pregledava. Nije prošao pravni pregled: sadržaj uzmite sa rezervom; sugestije i ispravke šaljite na kontakt@tehnickavlada.rs
Tehnička vlada

← Svi akti · Infrastruktura

Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.

SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE

Ministarstvo građevinarstva, saobraćaja i infrastrukture

posle izbora

Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.

Šta možete da uradite

Vrsta akta još nije određena. Pogledajte katalog akcija.

Ključni podaci

Oblast
Građevinarstvo, saobraćaj, infrastruktura
Vrsta dokumenta
Konkurs, oglas
Datum
2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)

Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.

Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
  • resor iz izvora: infrastruktura
Prilozi (1)
  • REoI - ToR SER-SRSM-QCBS-CS-23-53 - Design for Ruma Šabac Bosnian Railway line.docx · arhiva · 120.286 znakova
    Izvučeni tekst
    REQUEST FOR EXPRESSIONS OF INTEREST
    CONSULTING SERVICES – FIRMS SELECTION
    Republic of Serbia
    The Serbia Railway Sector Modernization Project (SRSM)
    Project ID No. P170868
    
    Assignment Title:
    Preparation of the Spatial Plan, Feasibility study with Preliminary Design and Environmental Impact Assessment study for reconstruction and modernization of the Ruma – Šabac – Donja Borina Junction – State Border railway line
    Reference No. SER-SRSM-QCBS-CS-23-53
    The Republic of Serbia has received a Loan from the International Bank for Reconstruction and Development (IBRD) in the amount of EURO 51 million and from the Agence Francaise de Développement (AFD) in the amount of EURO 51 million, toward the cost of the Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA) and intends to apply part of the proceeds to payments for consulting services for Preparation of the Spatial Plan, Feasibility study with Preliminary Design and Environmental Impact Assessment study for reconstruction and modernization of the Ruma – Šabac – Donja Borina Junction – State Border railway line.
    The consulting services (“the Services”) include are divided into three activities:
    Activity 1: Inception report;
    Activity 2: Preparation of the Spatial Plan, Feasibility Study with Preliminary Design
    and Environmental Impact Assessment Study
    Activity 3: Support in preparation of procurement documents
    Activity 1: The Inception Report shall be the specific output of the Inception Period and present an overall approach and detailed program work plan and completion schedule for the services. It should discuss constraints and challenges identified by the Consultant and ways to address them in order to timely and effectively deliver the assignment.
    Activity 2: Preparation of the Spatial Plan, Feasibility Study with Preliminary Design and Environmental Impact Assessment Study is divided into the following sub-activities:
    Sub-activity 2.1: Preparation of the Spatial plan for the special-purpose area for Infrastructure Corridor
    Sub-activity 2.2: Preparation of the Preliminary Solution
    Sub-activity 2.3: Preparation of the Feasibility Study with Preliminary Design
    Sub-activity 2.4: Preparation of the Environmental Impact Assessment Study
    Activity 3: Support in preparation of procurement documents: Within this Activity, the Consultant will prepare technical scope of Employers requirements and schedule of prices based on a template to be provided by the Client that will be part of the tender document.
    Contract duration: 23 months starting from the commencement date, but no later than 31 December 2026, as Project completion date.
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI):
    https://www.mgsi.gov.rs/lat/dokumenti/serbia-railway-sector-modernization-project-srsm-design-ruma-sabac-bosnian-border-railway
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.
    The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 2017, August 2018 and November 2020). The Client intends to shortlist up to eight eligible firms to whom a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, i
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE

Dokumenti: 

REoI - ToR SER-SRSM-QCBS-CS-23-53 - Design for Ruma Šabac Bosnian Railway line.docx
Povezani akti (8)

Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.