SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR PANČEVO MAIN – VRŠAC – ROMANIAN BORDER RAILWAY LINE

Ministarstvo građevinarstva, saobraćaja i infrastrukture

posle izbora

Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.

Šta možete da uradite

Vrsta akta još nije određena. Pogledajte katalog akcija.

Ključni podaci

Oblast
Građevinarstvo, saobraćaj, infrastruktura
Vrsta dokumenta
Konkurs, oglas
Datum
2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)

Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.

Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
  • resor iz izvora: infrastruktura
Prilozi (1)
  • REoI-ToR SER-SRSM-QCBS-CS-21-21 - Technical Documentation Pancevo main - Vrsac - Romanian border.pdf · arhiva · 99.735 znakova
    Izvučeni tekst
    1 
    
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    Assignment Title: 
    Preparation of the Spatial Plan, Feasibility Study with Preliminary Design and Environmental 
    Impact Assessment Study for reconstruction and modernization Pančevo Main – Vršac – 
    Romanian border railway line 
    Reference No. SER-SRSM-QCBS-CS-21-21 
    The Republic of Serbia has received a Loan from the International Bank for Reconstruction and 
    Development (IBRD) in the amount of EURO 51 million and from the Agence Francaise de 
    Développement (AFD) in the amount of EURO 51 million, toward the cost of the Serbia Railway Sector 
    Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA) and intends to apply 
    part of the proceeds to payments for consulting services for Preparation of the Spatial Plan, Feasibility 
    Study with Preliminary Design and Environmental Impact Assessment Study for reconstruction and 
    modernization Pančevo Main – Vršac – Romanian border railway line. 
    The consulting services (“the Services”) include are divided into two activities: 
     
    Activity 1: Inception report; 
     
    Activity 2: Prior Studies - Option analysis report 
     
    Activity 3: Preparation of the Spatial Plan, Feasibility Study with Preliminary Design and 
    Environmental Impact Assessment Study 
     
    Activity 4: Support in preparation of procurement documents 
    Activity 1: The Inception Report shall be the specific output of the Inception Period and present an 
    overall approach and detailed program work plan and completion schedule for the services. It should 
    discuss constraints and challenges identified by the Consultant and ways to address them in order to 
    timely and effectively deliver the assignment. 
    Activity 2: Prior Studies - Option analysis report is divided in the following sub-activities: 
    Sub-activity 2.1 - Preparation of Demand Study 
    Sub-activity 2.2 - Preparation of Railway Operation Plan 
    Sub-activity 2.3 - Options proposal 
    Sub-activity 2.4 - Selection of the Option 
    Activity 3: Preparation of the Spatial Plan, Feasibility Study with Preliminary Design and Environmental 
    Impact Assessment Study is divided in the following sub-activities: 
    Sub-activity 3.1: Preparation of the Spatial plan for the special-purpose area for Infrastructure 
    Corridor 
    Sub-activity 3.2: Preparation of the Preliminary Solution 
    
    2 
    
    Sub-activity 3.3: Preparation of the Feasibility Study with Preliminary Design 
    Sub-activity 3.4: Preparation of the Environmental Impact Assessment Study 
    Activity 4: Support in preparation of procurement documents: Within this Activity, the Consultant will 
    prepare technical scope of Employers requirements and schedule of prices based on a template to be 
    provided by the Client that will be part of the tender document 
    Contract duration: 27 months starting from the commencement date, but no later than 31 
    December 2026, as Project completion date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of 
    the Ministry of Construction, Transport and Infrastructure (MoCTI): 
    https://www.mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-design-pancevo-
    main-vrsac-romanian-border 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consulting firms 
    (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide 
    information demonstrating that they have the required qualifications and relevant experience to perform 
    the Services. 
    The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) 
    method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised 
    November 2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible 
    firms to whom a subsequent Request for Proposals (RFP), both 
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR PANČEVO MAIN – VRŠAC – ROMANIAN BORDER RAILWAY LINE