SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) - MEASUREMENT STATIONS – SUPERVISION AND WORKS
Ministarstvo građevinarstva, saobraćaja i infrastrukture
posle izbora
Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.
Šta možete da uradite
Vrsta akta još nije određena. Pogledajte katalog akcija.
Ključni podaci
- Oblast
- Građevinarstvo, saobraćaj, infrastruktura
- Vrsta dokumenta
- Konkurs, oglas
- Datum
- 2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)
Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.
Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
- resor iz izvora: infrastruktura
Prilozi (7)
- Contract Award.pdf · arhiva · 2.430 znakova
Izvučeni tekst
Contract Award Project: P170868-Serbia Railway Sector Modernization Loan/Credit/TF Info: IBRD-92210 Bid/Contract Reference No: SER-SRSM-RFB-PLANT-23-46 Procurement Method: RFB-Request for Bids Scope of Contract: Design, supply and installation of Wayside monitoring measurement stations Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2024/06/21 Duration of Contract 9 Month(s) Awarded Bidder(s): ITSS (823355) Avenida Jeronimo Roure 43, 46520 Puerto de Sagunto, Valencia Country: Spain FOTON GMB (823367) Vinogradska 24, Beograd Country: Serbia Bid Price at Opening RSD Evaluated Bid Price RSD 95833589.90 Signed Contract price EUR 817747.17 Beneficial Ownership Details ITSS (823355) Form Date: 24-JUN-24 Name Nationality Residence Country Conditions Met Bernd Volkmar Neuroth DE Spain Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent Name Nationality Residence Country Conditions Met Petra Herbst Neuroth DE Spain Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights FOTON GMB (823367) Form Date: 26-JUN-24 Name Nationality Residence Country Conditions Met Branko Milorad Gardijan YF Serbia Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent Evaluated Bidder(s): ALTPRO (823373) Velika cesta 41, 10020 Zagreb Country: Croatia SIGNALING (823375) Tošin bunar 187, 11070 Beograd Country: Serbia Bid Price at Opening RSD Evaluated Bid Price RSD 163925458.62 Rejected Bidder(s): STARMON SRO (823372) Průmyslová 1880, Choceň 565 01 , Czech Republic Country: Czech Republic Bid Price at Opening RSD Evaluated Bid Price RSD Reason for Rejection Non Responsive KBV DATACOM (735567) Vladimira Popovića 6, 11070 Beograd Country: Serbia KONTRON (823381) Ljubljanska cesta 24A, 4000 Kranj Country: Slovenia SSAMAKS (823386) Milivoja Pavlovića 7, 11000 Beograd Country: Serbia Bid Price at Opening RSD Evaluated Bid Price RSD Reason for Rejection Non Responsive
- SPN - SER-SRSM-RFB-PLANT-23-46 - Design, supply and installation of Wayside monitoring ms -EXTENSION3.pdf · arhiva · 8.013 znakova
Izvučeni tekst
DEADLINE EXTENSION FROM JANUARY 10, 2024 TO JANUARY 22, 2024 Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Without Prequalification) Employer: Ministry of Construction, Transport and Infrastructure (MCTI) Project: Serbia Railway Sector Modernization (SRSM) Project Contract title: Design, supply and installation of Wayside monitoring measurement stations Country: Republic of Serbia Loan No. 9221YF/CFA CRS 1015 02 D RFB No: SER-SRSM-RFB-PLANT-23-46 1. The Republic of Serbia (hereinafter called “Borrower”) has received financing from the International Bank for Reconstruction and Development (IBRD) (the “Bank”) and the Agency Francaise de Development (AFD) in the form of a loan (hereinafter called “loan”) toward the cost of the Serbia Railway Sector Modernization (SRSM) Project. The Ministry of Construction, Transport and Infrastructure (MCTI), an implementing agency of the Borrower, intends to apply a portion of the proceeds of this loan to eligible payments under the contract for which this Request for Bids is issued. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing. 2. The MCTI now invites sealed Bids from eligible Bidders for Design, supply and installation of Wayside monitoring measurement stations Scope of the Works includes design, supply, installation and commissioning of 4 measurement stations located at strategic points in the network to prevent accidents/derailments of rail rolling stock including services related to Trainings and preparation of Operational and Maintenance Manuals (documentation). These systems will assist IZS to better manage its network by ensuring that operators comply with operational and safety standards. Measuring stations planned for procurement will have a modular design and the ability to connect several types of measuring and diagnostic modules within the same central managing unit (hot box and hot wheel, dynamic scale, gauge (dimensions) measurement, suspended load detection, train/vehicle recognition, interface with train auto-stop device). Modules for "hot wheel" and "hot box" will include devices that measure the temperature of the axle set, wheel, axles, and brake discs. Devices will recognize when it comes to detecting overheated wheels due to blocked brakes at the same wheel with the devices will measure, i.e. to monitor the temperature of axle bearings and brakes without contact with the measured elements. Module for the rolling stock detection should use wheel sensors with 2 detection channels that are fully functionally independent and galvanically isolated Due to compatibility with existing traction vehicles that operate on infrastructure, the solution will be harmonized with the CCS TSI, Index 77 - frequency management with technical parameters of train detection system - Part 2: Axle counters of SRPS EN 50617- 2. Devices will be integrated in the central managing unit which will be deployed in standard containers for the accommodation of technical devices and systems that can meet the condition of optimal temperature necessary for the operation of electronic measuring devices which will be supplied with the necessary electrical installations of strong and weak current. The software must be installed on the computer for evaluation and data management, and it should perform the functions of evaluation, management and diagnostics of the entire system. Locations and number of tracks for installation of measurement stations are given in the table below. Table 1. List of locations for installation of measurement stations No Railway line Station vicinity 1 Beograd Centar – Valjevo – Požega – Vrbnica - državna granica – (Bijelo Polje); Barajevo 2 Beograd Centar – Mladenovac – Lapovo – Niš – Preševo – državna granica – (Tabanovce) Preševo 3
- SPN - SER-SRSM-RFB-PLANT-23-46-Design, supply and installation of Wayside monitoring ms -EXTENSION2.pdf · arhiva · 8.558 znakova
Izvučeni tekst
DEADLINE EXTENSION FROM NOVEMBER 8, 2023 TO JANUARY 10, 2024 Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Without Prequalification) Employer: Ministry of Construction, Transport and Infrastructure (MCTI) Project: Serbia Railway Sector Modernization (SRSM) Project Contract title: Design, supply and installation of Wayside monitoring measurement stations Country: Republic of Serbia Loan No. 9221YF/CFA CRS 1015 02 D RFB No: SER-SRSM-RFB-PLANT-23-46 Issued on: October 12, 2023 1. The Republic of Serbia (hereinafter called “Borrower”) has received financing from the International Bank for Reconstruction and Development (IBRD) (the “Bank”) and the Agency Francaise de Development (AFD) in the form of a loan (hereinafter called “loan”) toward the cost of the Serbia Railway Sector Modernization (SRSM) Project. The Ministry of Construction, Transport and Infrastructure (MCTI), an implementing agency of the Borrower, intends to apply a portion of the proceeds of this loan to eligible payments under the contract for which this Request for Bids is issued. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing. 2. The MCTI now invites sealed Bids from eligible Bidders for Design, supply and installation of Wayside monitoring measurement stations Scope of the Works includes design, supply, installation and commissioning of 4 measurement stations located at strategic points in the network to prevent accidents/derailments of rail rolling stock including services related to Trainings and preparation of Operational and Maintenance Manuals (documentation). These systems will assist IZS to better manage its network by ensuring that operators comply with operational and safety standards. Measuring stations planned for procurement will have a modular design and the ability to connect several types of measuring and diagnostic modules within the same central managing unit (hot box and hot wheel, dynamic scale, gauge (dimensions) measurement, suspended load detection, train/vehicle recognition, interface with train auto-stop device). Modules for "hot wheel" and "hot box" will include devices that measure the temperature of the axle set, wheel, axles, and brake discs. Devices will recognize when it comes to detecting overheated wheels due to blocked brakes at the same wheel with the devices will measure, i.e. to monitor the temperature of axle bearings and brakes without contact with the measured elements. Module for the rolling stock detection should use wheel sensors with 2 detection channels that are fully functionally independent and galvanically isolated Due to compatibility with existing traction vehicles that operate on infrastructure, the solution will be harmonized with the CCS TSI, Index 77 - frequency management with technical parameters of train detection system - Part 2: Axle counters of SRPS EN 50617- 2. Devices will be integrated in the central managing unit which will be deployed in standard containers for the accommodation of technical devices and systems that can meet the condition of optimal temperature necessary for the operation of electronic measuring devices which will be supplied with the necessary electrical installations of strong and weak current. The software must be installed on the computer for evaluation and data management, and it should perform the functions of evaluation, management and diagnostics of the entire system. Locations and number of tracks for installation of measurement stations are given in the table below. Table 1. List of locations for installation of measurement stations # Railway line Station Chainage of entry and distant signal Number of tracks Note 1 Beograd Centar – Stara Pazova – Šid – državna granica – (Tovarnik); Šid ES Qu-91: 117+384 DS PQu-91: 11
- SPN - SER-SRSM-RFB-PLANT-23-46-Design, supply and installation of Wayside monitoring measurement stations-EXTENSION.pdf · arhiva · 8.558 znakova
Izvučeni tekst
DEADLINE EXTENSION FROM SEPTEMBER 8, 2023 TO NOVEMBER 8, 2023 Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Without Prequalification) Employer: Ministry of Construction, Transport and Infrastructure (MCTI) Project: Serbia Railway Sector Modernization (SRSM) Project Contract title: Design, supply and installation of Wayside monitoring measurement stations Country: Republic of Serbia Loan No. 9221YF/CFA CRS 1015 02 D RFB No: SER-SRSM-RFB-PLANT-23-46 Issued on: August 22, 2023 1. The Republic of Serbia (hereinafter called “Borrower”) has received financing from the International Bank for Reconstruction and Development (IBRD) (the “Bank”) and the Agency Francaise de Development (AFD) in the form of a loan (hereinafter called “loan”) toward the cost of the Serbia Railway Sector Modernization (SRSM) Project. The Ministry of Construction, Transport and Infrastructure (MCTI), an implementing agency of the Borrower, intends to apply a portion of the proceeds of this loan to eligible payments under the contract for which this Request for Bids is issued. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing. 2. The MCTI now invites sealed Bids from eligible Bidders for Design, supply and installation of Wayside monitoring measurement stations Scope of the Works includes design, supply, installation and commissioning of 4 measurement stations located at strategic points in the network to prevent accidents/derailments of rail rolling stock including services related to Trainings and preparation of Operational and Maintenance Manuals (documentation). These systems will assist IZS to better manage its network by ensuring that operators comply with operational and safety standards. Measuring stations planned for procurement will have a modular design and the ability to connect several types of measuring and diagnostic modules within the same central managing unit (hot box and hot wheel, dynamic scale, gauge (dimensions) measurement, suspended load detection, train/vehicle recognition, interface with train auto-stop device). Modules for "hot wheel" and "hot box" will include devices that measure the temperature of the axle set, wheel, axles, and brake discs. Devices will recognize when it comes to detecting overheated wheels due to blocked brakes at the same wheel with the devices will measure, i.e. to monitor the temperature of axle bearings and brakes without contact with the measured elements. Module for the rolling stock detection should use wheel sensors with 2 detection channels that are fully functionally independent and galvanically isolated Due to compatibility with existing traction vehicles that operate on infrastructure, the solution will be harmonized with the CCS TSI, Index 77 - frequency management with technical parameters of train detection system - Part 2: Axle counters of SRPS EN 50617- 2. Devices will be integrated in the central managing unit which will be deployed in standard containers for the accommodation of technical devices and systems that can meet the condition of optimal temperature necessary for the operation of electronic measuring devices which will be supplied with the necessary electrical installations of strong and weak current. The software must be installed on the computer for evaluation and data management, and it should perform the functions of evaluation, management and diagnostics of the entire system. Locations and number of tracks for installation of measurement stations are given in the table below. Table 1. List of locations for installation of measurement stations # Railway line Station Chainage of entry and distant signal Number of tracks Note 1 Beograd Centar – Stara Pazova – Šid – državna granica – (Tovarnik); Šid ES Qu-91: 117+384 DS PQu-91: 11
- Specific Procurement Notice - SER-SRSM-RFB-PLANT-23-46 Design, supply and installation of Wayside monitoring measurement station.pdf · arhiva · 8.492 znakova
Izvučeni tekst
Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Without Prequalification) Employer: Ministry of Construction, Transport and Infrastructure (MCTI) Project: Serbia Railway Sector Modernization (SRSM) Project Contract title: Design, supply and installation of Wayside monitoring measurement stations Country: Republic of Serbia Loan No. 9221YF/CFA CRS 1015 02 D RFB No: SER-SRSM-RFB-PLANT-23-46 Issued on: July 5, 2023 1. The Republic of Serbia (hereinafter called “Borrower”) has received financing from the International Bank for Reconstruction and Development (IBRD) (the “Bank”) and the Agency Francaise de Development (AFD) in the form of a loan (hereinafter called “loan”) toward the cost of the Serbia Railway Sector Modernization (SRSM) Project. The Ministry of Construction, Transport and Infrastructure (MCTI), an implementing agency of the Borrower, intends to apply a portion of the proceeds of this loan to eligible payments under the contract for which this Request for Bids is issued. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing. 2. The MCTI now invites sealed Bids from eligible Bidders for Design, supply and installation of Wayside monitoring measurement stations Scope of the Works includes design, supply, installation and commissioning of 4 measurement stations located at strategic points in the network to prevent accidents/derailments of rail rolling stock including services related to Trainings and preparation of Operational and Maintenance Manuals (documentation). These systems will assist IZS to better manage its network by ensuring that operators comply with operational and safety standards. Measuring stations planned for procurement will have a modular design and the ability to connect several types of measuring and diagnostic modules within the same central managing unit (hot box and hot wheel, dynamic scale, gauge (dimensions) measurement, suspended load detection, train/vehicle recognition, interface with train auto-stop device). Modules for "hot wheel" and "hot box" will include devices that measure the temperature of the axle set, wheel, axles, and brake discs. Devices will recognize when it comes to detecting overheated wheels due to blocked brakes at the same wheel with the devices will measure, i.e. to monitor the temperature of axle bearings and brakes without contact with the measured elements. Module for the rolling stock detection should use wheel sensors with 2 detection channels that are fully functionally independent and galvanically isolated Due to compatibility with existing traction vehicles that operate on infrastructure, the solution will be harmonized with the CCS TSI, Index 77 - frequency management with technical parameters of train detection system - Part 2: Axle counters of SRPS EN 50617- 2. Devices will be integrated in the central managing unit which will be deployed in standard containers for the accommodation of technical devices and systems that can meet the condition of optimal temperature necessary for the operation of electronic measuring devices which will be supplied with the necessary electrical installations of strong and weak current. The software must be installed on the computer for evaluation and data management, and it should perform the functions of evaluation, management and diagnostics of the entire system. Locations and number of tracks for installation of measurement stations are given in the table below. Table 1. List of locations for installation of measurement stations # Railway line Station Chainage of entry and distant signal Number of tracks Note 1 Beograd Centar – Stara Pazova – Šid – državna granica – (Tovarnik); Šid ES Qu-91: 117+384 DS PQu-91: 118+360 2 The Employer proposes to deploy measuring stations be
- REoI-SER-SRSM-QCBS-CS-21-19-2 - Supervision of 4 measurement stations.pdf · arhiva · 10.087 znakova
Izvučeni tekst
1 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical Design Review and Supervision of installation for 4 measurement stations Reference No. SER-SRSM-QCBS-CS-21-19-2 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The Consultant will be assigned to perform technical design review of Preliminary Design(s) prepared by Contractor to be selected for supply and installation of measurement station and review and give consent on Performing Designs1 and supervision of activities on supply, installation and commissioning of measurement stations in line with relevant national regulations and engineering practices. All the activities to be executed by the Consultant are divided into 2 phases as follow: Phase 1 – Design Review Phase that includes activities relevant to a technical review of Preliminary Design(s) Designs will be prepared in accordance with Article 145 of Law on Planning and Construction ("Official Gazette of RS", No. 72/221A9, 81/221A9 - corrigendum, 64/2010 - US decision, 24/2011, 121/2012, 42/2013 - US decision, 50/2013 - US decision, 98/2013 - US decision, 132/2014, 145/2014, 83/2018, 31/2019, 37/2019 - other law and 9/2020) and Consaltant will be obliged to review it in accordane with Rulebook on the content, manner and procedure of preparation and manner of control of technical documentation according to the classes and purposes of the objects ("Official Gazette of RS", No. 73/2019),and Phase 2 - Supervision and Works Contract administration to provide full supervisory services during supply and installation works in accordance with the WB Conditions of Contract Plant, Design, Supply and Installation. 1 Performing Design (srb. Projekat za izvođenje) - contains detailed technical solutions elaborating the details and technical solutions within the boundaries of the construction area, specified by the construction permit design. Performing Design can be drafted in phases, i.e. by segments, in line with the schedule of construction, i.e. execution of works. 2 Phase 1 – Design Review Phase assumes the following activities: Activity 1: Inception period Activity 2 Technical Design Review Phase 2 - Supervision and Works Contract administration assumes the following activities: Activity 1: Pre-construction activities Activity 2: Services during Construction Activity 3: Equipment control and testing services Activity 4: Handover and commissioning activities Contract duration for both Phases: 10 months starting from the commencement date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI): https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-measurement- stations-supervision-and The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The Consultant firm will be selected in accordance with QCBS (Quality and Cost Based Selection) method set out in the World Bank’s Procuremen - TOR-SER-SRSM-QCBS-CS-21-19-2 - Supervision of 4 measurement stations.pdf · arhiva · 43.107 znakova
Izvučeni tekst
The Serbia Railway Sector Modernization (SRSM) Project Phase 1 of the Multi-Phase Programmatic Approach TERMS OF REFERENCE for Technical Design Review and Supervision of installation for 4 measurement stations February 2023 Abbreviation Meaning ADF Agence Francaise de Développement CBA Cost-benefit analysis EIA Environmental Impact Assessment Study GIIP Good International Industry Practice FIDIC International Federation of Consulting Engineers IBRD International Bank for Reconstruction and Development IZS Serbian Railways Infrastructure MoCTI Ministry of Construction, Transport, and Infrastructure PIU Project Implementation Unit PIT Project Implementation Teams PD Preliminary Design Project Serbia Railway Sector Modernization (SRSM) Project RAP Resettlement Action Plan RAMS Reliability, availability, maintainability and safety TA Technical Assistance TEN-T Trans-European Networks - Transport ToR Terms of Reference WB World Bank WB ESIA World Bank Environmental and Social Impact Assessment WB EHSG World Bank Environmental, Health, and Safety Guidelines WB ESMF World Bank Environmental and Social Management Framework WB ESF World Bank Environmental and Social Framework WB LMP World Bank Labour Management Procedure WB OHS World Bank Occupational Health and Safety 1. Background information 1.1 Beneficiary country: Republic of Serbia Client: Ministry of Construction, Transport, and Infrastructure of Republic of Serbia (MoCTI). Final Beneficiary: Infrastruktura železnica Srbije (Serbian Railway Infrastructure - IZS). 1.2 Project Information The World Bank launched the Multiphase Programmatic Approach (MPA) to support the Government of Serbia in the continuation of institutional, physical and operational modernization of the railway sector in an integrated manner through providing financial support to Serbia Railway Sector Modernization Project as part of the MPA to be implemented in three overlapping phases over the ten-year period. To finance Serbia Railway Sector Modernization Project, Phase 1 of the MPA (the Project), the International Bank for Reconstruction and Development (IBRD), as part of the World Bank Group, and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. The Project includes the following Components: Component 1: Infrastructure Investments and Asset Management. This component focuses on improving the quality and safety of railway infrastructure and enhancing rail asset management practices. This ToRs is part of the Sub-Component 1.1 Reliable and Safe Railway Infrastructure Component 2: Institutional Strengthening and Project Management. This component focuses on strengthening rail policies and institutions to deepen and sustain recent reforms. Component 3: Railway Modernization Enablers. This component will finance measures to protect the vulnerable and poor and strengthen sectoral enablers for sustainable business growth and job creation. The Project is managed by the MCTI through the Project Implementation Unit (PIU) supplemented by the Project Implementation Teams (PITs) in Railway Directorate (RD) and in railway companies, respectively IZS, SV and SC. PITs act as subordinate implementing agencies and provide technical support for specific Project subcomponents or activities of the MPA that pertain to their area of expertise. The Central Fiduciary Unit (CFU) in the Ministry of Finance provides procurement and financial services for the project. Primary responsibility for Project execution lies on PIU, which will ensure that the Project development objectives are met. 1.3 General Railways Sector Information The position of Serbia in the European railway network is such that it forms part of the shortest traffi
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) - MEASUREMENT STATIONS – SUPERVISION AND WORKS Dokumenti: Contract Award.pdf SPN - SER-SRSM-RFB-PLANT-23-46 - Design, supply and installation of Wayside monitoring ms -EXTENSION3.pdf SPN - SER-SRSM-RFB-PLANT-23-46-Design, supply and installation of Wayside monitoring ms -EXTENSION2.pdf SPN - SER-SRSM-RFB-PLANT-23-46-Design, supply and installation of Wayside monitoring measurement stations-EXTENSION.pdf Specific Procurement Notice - SER-SRSM-RFB-PLANT-23-46 Design, supply and installation of Wayside monitoring measurement station.pdf REoI-SER-SRSM-QCBS-CS-21-19-2 - Supervision of 4 measurement stations.pdf TOR-SER-SRSM-QCBS-CS-21-19-2 - Supervision of 4 measurement stations.pdf
Povezani akti (8)
- Request for Quotation (RFQ) Purchasing of SUV Vehicle and Mid-size/large car (D-segment) for PIU for LIID · 2.11.2026.
- ODLUKA O SPROVOĐENJU POSTUPKA ZA DODELU SREDSTAVA KAO STIMULATIVNIH MERA PUTEM JAVNOG POZIVA ZA UNAPREĐENJE KOMBINOVANOG TRANSPORTA ZA 2024. GODINU · 9.9.2024.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – TECHNICAL ASSISTANCE FOR MAINTENANCE OUTSOURCING CONTRACT · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Site Supervision for Works – Belgrade Centre Railway Station · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – CREWS SCHEDULING INFORMATION SYSTEM FOR SRBIJAVOZ · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – ESIA FRAMEWORK AGREEMENT · 2.11.2026.
- WESTERN BALKANS TRADE AND TRANSPORT FACILITATION PROJECT (WBTTF) – DESIGN, SUPPLY AND INSTALLATION OF NATIONAL SINGLE WINDOW SYSTEM · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE · 2.11.2026.
Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.