Sajt nastaje poluautomatski: AI prikuplja akte i predlaže ocene, a tim ljudi ih pregledava. Nije prošao pravni pregled: sadržaj uzmite sa rezervom; sugestije i ispravke šaljite na kontakt@tehnickavlada.rs
Tehnička vlada

← Svi akti · Infrastruktura

Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.

SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – IT Strategy and Marketing Strategy for SV

Ministarstvo građevinarstva, saobraćaja i infrastrukture

posle izbora

Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.

Šta možete da uradite

Vrsta akta još nije određena. Pogledajte katalog akcija.

Ključni podaci

Oblast
Građevinarstvo, saobraćaj, infrastruktura
Vrsta dokumenta
Konkurs, oglas
Datum
2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)

Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.

Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
  • resor iz izvora: infrastruktura
Prilozi (8)
  • Contract Award Notice SER-SRSM-QCBS-CS-22-44-2.pdf · arhiva · 2.032 znakova
    Izvučeni tekst
    Contract Award 
    Project: P170868-Serbia Railway Sector Modernization 
    Loan/Credit/TF Info: IBRD-92210 
    Bid/Contract Reference No: SER-SRSM-QCBS-CS-22-44-2 
    Procurement Method: QCBS-Quality And Cost-Based Selection 
    Scope of Contract: Technical assistance to support Srbija Voz to adopt commercially 
    oriented marketing systems 
    Notice Version No: 0 
    
    Date Notification of Award Issued 
    (YYYY/MM/DD) 
    2024/08/28 
    Duration of Contract 
    
    12 Month(s) 
    Minimum Qualifying Score 
    
    80 
    Awarded Firm(s): 
    MAJO PUBLIC (600327) 
    Dečanska 12, Belgrade 
    Country: Serbia 
    
    Beneficial Ownership Details 
    Form Date: 22-AUG-24 
    Name 
    Nationality Residence 
    Country 
    Conditions Met 
    Maja Grcic 
    YF 
    Serbia 
    Directly or indirectly holding 25% or 
    more of the shares, Directly or 
    indirectly holding 25 % or more of the 
    Voting Rights, Directly or indirectly 
    having the right to appoint a majority of 
    
    Name 
    Nationality Residence 
    Country 
    Conditions Met 
    the board of the directors or an 
    equivalent 
    Jovana Joksimovic 
    YF 
    Serbia 
    Directly or indirectly holding 25% or 
    more of the shares, Directly or 
    indirectly holding 25 % or more of the 
    Voting Rights, Directly or indirectly 
    having the right to appoint a majority of 
    the board of the directors or an 
    equivalent 
    
    IPSOS STRATEGIC MARKETING DOO (669922) 
    Country: Serbia 
    
    Beneficial Ownership Details 
    Form Date: 23-AUG-24 
    
    FULLHOUSE OGILVY ADVERTISING AGENCY (735488) 
    Country: Serbia 
    
    Beneficial Ownership Details 
    Form Date: 23-AUG-24 
    
    Summary of Reason 
    No owners meet conditions 
    
    Scores 
    
    Technical: 
    98.12 
     Methodology: 
    48.98 
     Key Personnel: 
    49.14 
    Financial: 
    20 
    Combined: 
    98.50 
    Rank: 
    1 
    Final Evaluation Price 
    RSD 57417536.83 
    Signed Contract Price 
    EUR 438975.00 
    Price: 
    Currency: 
    Amount: 
    Euro (Euro) 
    438975.00 
    Evaluated Firm(s): 
    RAIL CLUSTER FOR SOUTH EAST EUROPE (842403) 
    Country: Serbia 
    
    GREEN STAR TECH D.O.O. (842401) 
    Country: Serbia 
    
    MINERVA RAIL (842345) 
    Country: United Kingdom 
    
    Final Evaluation Price 
    RSD 87491055.11 
    
    Price: 
    Currency: 
    Amount:
  • REoI-ToR SER-SRSM-QCBS-CS-22-44-2 - Marketing Strategy for SV NEW FEBRUARY 2024.pdf · arhiva · 46.073 znakova
    Izvučeni tekst
    1 
    
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    Assignment Title: 
    Technical assistance to support Srbijavoz to adopt commercially oriented marketing 
    systems 
    Reference No. SER-SRSM-QCBS-CS-22-44-2 
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase 
    Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and 
    the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million 
    loan to support enhancing the efficiency and safety of existing railway assets and improving governance 
    and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to 
    payments for consulting services to be procured under this project. 
    Scope of Work 
    The objective of the Assignment is to provide technical assistance (TA) to support SV to adopt commercially 
    oriented marketing systems. This TA will assist: (i) the GoS and SV to identify user needs and preferences 
    and (ii) SV to establish a Strategic Framework for modern marketing tools with comprehensive action and 
    investment plan. 
    The Scope of Work is divided into three activities: 
     
    Activity 1: Identifying user needs and preferences 
     
    Activity 2: Marketing Strategic framework for SV; 
     
    Activity 3: Preparing an Action plan for the implementation of modern marketing tools 
    Activity 1: Under this Activity the Consultant will conduct a series of user needs analysis, to serve as a 
    basis for the development of Marketing strategy for SV and the accompanying Action plan. To this end 
    under this activity the Consultant would provide an overview of the best modern marketing practices across 
    the world, perform extensive user surveys across the country, define the desired state (KPI) for SV and 
    identify gap between desired and observed as well as possible ways to reach the desired state including 
    their costs and benefits, and conclude with the strategy that should support the SV to reach the desired 
    state through modern marketing approaches. 
    Task 1.1: Getting best practices 
    Task 1.2: Analysis of the achieved business results SV from the status change until today and 
    identification of resources for improvement trough modern marketing tools 
    Task 1.3: Conduct user needs and preferences surveys and research 
    Task 1.4: Proposals for improvement marketing tools 
    
    Activity 2: Under this Activity the Consultant will develop the marketing strategy for SV with main focus on 
    modern marketing tools and goal of attracting new users and increasing user satisfaction. 
    
    2 
    
    Task 2.1: Preparation of the Marketing Strategy of SV 
    
    Activity 3: This Activity will be direct continuation of Activity 2 under this assignment, under which the 
    Consultant will identify effective marketing tools and produce a detailed Action Plan for implementation of 
    the Marketing Strategy. The Action Plan should also seek to include the expected costs, responsible 
    stakeholders, and KPI through which the progress toward that goal could be monitored. 
    Task 3.1: Multi-criteria analysis of identified effective specific marketing tools 
    Task 3.2: Marketing Strategy Action plan with timeline and investment plan 
    Task 3.3: Producing detailed integrated marketing campaigns (IMC) and marketing material 
    
    Contract duration: 12 months starting from the commencement date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of 
    the Ministry of Construction, Transport and Infrastructure (MoCTI) 
    https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and-
    marketing-strategy-sv 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their 
    interest in providing the Services. Interested Consultants should provide 
  • Contract Award Notice - SER-SRSM-QCBS-CS-22-43.pdf · arhiva · 1.934 znakova
    Izvučeni tekst
    Contract Award 
    Project: P170868-Serbia Railway Sector Modernization 
    Loan/Credit/TF Info: IBRD-92210 
    Bid/Contract Reference No: SER-SRSM-QCBS-CS-22-43 
    Procurement Method: QCBS-Quality And Cost-Based Selection 
    Scope of Contract: Technical assistance for preparation of IT Strategy and 
    Digitalization activities for Srbija Voz (SV) 
    Notice Version No: 0 
    
    Date Notification of Award Issued 
    (YYYY/MM/DD) 
    2024/01/23 
    Duration of Contract 
    
    10 Month(s) 
    Minimum Qualifying Score 
    
    80 
    Awarded Firm(s): 
    PRICEWATERHOUSECOOPERS D.O.O. SARAJEVO (735474) 
    Country: Bosnia and Herzegovina 
    
    IGMAKO SMART SOLUTIONS (675156) 
    Omladinskih brigada 88-90, 11070 Belgrade 
    Country: Serbia 
    
    PRICEWATERHOUSECOOPERS CONSULTING D.O.O. (735502) 
    Country: Serbia 
    
    PRICEWATERHOUSECOOPERS ČESKÁ REPUBLIKA, S.R.O. (735503) 
    Country: Czech Republic 
    
    Scores 
    Technical: 
    92.76 
     Methodology: 
    31.77 
     Key Personnel: 
    58.07 
     Participation by Nationals: 
    2.92 
    Financial: 
    100 
    Combined: 
    94.21 
    Rank: 
    1 
    Final Evaluation Price 
    RSD 53809778.13 
    
    Signed Contract Price 
    EUR 457458.00 
    Price: 
    Currency: 
    Amount: 
    Euro (Euro) 
    457458.00 
    Evaluated Firm(s): 
    MOTT MACDONALD ROMANIA SRL (407705) 
    Country: Romania 
    
    DEVELLOP D.O.O. (735501) 
    Country: Serbia 
    
    Final Evaluation Price 
    RSD 69165146.40 
    Price: 
    Currency: 
    Amount: 
    EGZAKTA DOO (735507) 
    Country: Serbia 
    
    FAKULTET ORGANIZACIONIH NAUKA (735499) 
    Country: Serbia 
    
    INFORMATIKA AD BEOGRAD (730216) 
    Country: Serbia 
    
    Final Evaluation Price 
    RSD 57167789.51 
    Price: 
    Currency: 
    Amount: 
    Rejected Firm(s): 
    CIVITTA INTERNATIONAL OÜ (735490) 
    Country: Estonia 
    
    MC MOBILITY CONSULTANTS GMBH (472959) 
    Country: Austria 
    
    Final Evaluation Price 
    Reason for Rejection 
    Failure to meet minimum technical score 
    Price: 
    Currency: 
    
    Amount: 
    ASPIRO AS (735477) 
    Country: Slovak Republic 
    
    Final Evaluation Price 
    Reason for Rejection 
    Failure to meet minimum technical score 
    Price: 
    Currency: 
    Amount:
  • REoI-SER-SRSM-QCBS-CS-22-44- MARKETING STRATEGY FOR SV - EXTENSION.pdf · arhiva · 7.331 znakova
    Izvučeni tekst
    1 
    
    EXTENSION OF DEADLINE FROM FEBRUARY 20, 2023 TO FEBRUARY 27, 2023 
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    Assignment Title: 
    Technical assistance to support Srbija Voz to adopt commercially oriented marketing 
    systems 
    Reference No. SER-SRSM-QCBS-CS-22-44 
    
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase 
    Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and 
    the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million 
    loan to support enhancing the efficiency and safety of existing railway assets and improving governance 
    and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to 
    payments for consulting services to be procured under this project. 
    Scope of Work 
    The objective of the Assignment is to provide technical assistance (TA) to support SV to adopt commercially 
    oriented marketing systems. This TA will assist: (i) the GoS and SV to identify user needs and preferences 
    and (ii) SV to establish a Strategic Framework for modern marketing tools with comprehensive action and 
    investment plan. 
    The Scope of Work is divided into two activities: 
     
    Activity 1: Marketing Strategic framework for SV; 
     
    Activity 2: Action plan for the implementation of modern marketing tools 
    Activity 1: Under this Activity the Consultant will develop the marketing strategy for SV with main focus on 
    modern marketing tools and goal of attracting new users and increasing user satisfaction. To this end under 
    this activity the Consultant would provide an overview of the best modern marketing practices across the 
    world, perform extensive user surveys across the country, define the desired state (KPI) for SV and identify 
    gap between desired and observed as well as possible ways to reach the desired state including their costs 
    and benefits, and conclude with the strategy that should support the SV to reach the desired state through 
    modern marketing approaches. Strategy should also include the expected costs, responsible stakeholders, 
    and KPI through which the progress toward that goal could be monitored. 
    
    2 
    
    Task 1.1: Getting best practices 
    Task 1.2: Analysis of the achieved business results SV from the status change until today and 
    identification of resources for improvement trough modern marketing tools 
    Task 1.3: Conduct user needs and preferences surveys and research 
    Task 1.4: Proposals for improvement marketing tools 
    Task 1.5: Preparation of the Marketing Strategy of SV 
    Activity 2: Action plan for the implementation of modern marketing tools. 
    Task 2.1: Multi-criteria analysis of identified effective specific marketing tools 
    Task 2.2: Marketing Strategy Action plan 
     Contract duration: 12 months starting from the commencement date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of 
    the 
    Ministry 
    of 
    Construction, 
    Transport 
    and 
    Infrastructure 
    (MoCTI) 
    https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and-
    marketing-strategy-sv 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their 
    interest in providing the Services. Interested Consultants should provide information demonstrating that 
    they have the required qualifications and relevant experience to perform the Services. 
    The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method 
    set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 
    2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible firms to whom 
    a subsequent Request for Proposals (RFP), both technical and financial,
  • REoI-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf · arhiva · 7.264 znakova
    Izvučeni tekst
    1 
    
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    Assignment Title: 
    Technical assistance to support Srbija Voz to adopt commercially oriented marketing 
    systems 
    Reference No. SER-SRSM-QCBS-CS-22-44 
    
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase 
    Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and 
    the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million 
    loan to support enhancing the efficiency and safety of existing railway assets and improving governance 
    and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to 
    payments for consulting services to be procured under this project. 
    Scope of Work 
    The objective of the Assignment is to provide technical assistance (TA) to support SV to adopt commercially 
    oriented marketing systems. This TA will assist: (i) the GoS and SV to identify user needs and preferences 
    and (ii) SV to establish a Strategic Framework for modern marketing tools with comprehensive action and 
    investment plan. 
    The Scope of Work is divided into two activities: 
     
    Activity 1: Marketing Strategic framework for SV; 
     
    Activity 2: Action plan for the implementation of modern marketing tools 
    Activity 1: Under this Activity the Consultant will develop the marketing strategy for SV with main focus on 
    modern marketing tools and goal of attracting new users and increasing user satisfaction. To this end under 
    this activity the Consultant would provide an overview of the best modern marketing practices across the 
    world, perform extensive user surveys across the country, define the desired state (KPI) for SV and identify 
    gap between desired and observed as well as possible ways to reach the desired state including their costs 
    and benefits, and conclude with the strategy that should support the SV to reach the desired state through 
    modern marketing approaches. Strategy should also include the expected costs, responsible stakeholders, 
    and KPI through which the progress toward that goal could be monitored. 
    Task 1.1: Getting best practices 
    Task 1.2: Analysis of the achieved business results SV from the status change until today and 
    identification of resources for improvement trough modern marketing tools 
    Task 1.3: Conduct user needs and preferences surveys and research 
    Task 1.4: Proposals for improvement marketing tools 
    Task 1.5: Preparation of the Marketing Strategy of SV 
    
    2 
    
    Activity 2: Action plan for the implementation of modern marketing tools. 
    Task 2.1: Multi-criteria analysis of identified effective specific marketing tools 
    Task 2.2: Marketing Strategy Action plan 
     Contract duration: 12 months starting from the commencement date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of 
    the 
    Ministry 
    of 
    Construction, 
    Transport 
    and 
    Infrastructure 
    (MoCTI) 
    https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and-
    marketing-strategy-sv 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their 
    interest in providing the Services. Interested Consultants should provide information demonstrating that 
    they have the required qualifications and relevant experience to perform the Services. 
    The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method 
    set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 
    2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible firms to whom 
    a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. 
    The assignment will require a qualified consulting
  • ToR-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf · arhiva · 36.292 znakova
    Izvučeni tekst
    1 
    
    The Serbia Railway Sector Modernization Project (SRSM) Project ID No. 
    P170868 
    
    TERMS OF REFERENCE 
    Technical assistance to support Srbija Voz to adopt commercially oriented 
    marketing systems 
    1 Background information 
    1.1 
    Beneficiary country: Republic of Serbia 
    Client: Ministry of Construction, Transport, and Infrastructure of Republic of Serbia (MoCTI). 
    Final Beneficiary: Srbija Voz (Company for Passenger Railway Transport – SV). 
    1.2 Relevant background 
    The Republic of Serbia is located at the crossroads of Central and Southeast Europe and is the 
    central part of the Balkans, spreading over an area of 88,361km2. As an upper middle-income 
    country with a Gross National Income per capita of US$ 7,409 (2019) and a population of 7 
    million (2018), Serbia is one of the main economies of the Western Balkans with positive 
    economic performance in the last 5 years. 
    The country is ranked relatively high in terms of competitiveness, investment climate and the 
    ease of doing business. The World Economic Forum’s global competitiveness index ranked 
    Serbia at 72 out of 141 countries in 2019, behind regional peers Slovenia (35), Bulgaria (49), 
    Romania (51) and Croatia (63) but ahead of Montenegro (73) and Albania (81). It is ranked 48th 
    by the World Bank’s Doing Business Index 2019, where it scored above regional average for 
    Europe and Central Asia. Since 2014, the Government of the Republic of Serbia (GoS) has made 
    good progress in reducing public debt, including through greater fiscal responsibility, reform of 
    the public administration, reform of the state-owned enterprises and an overall increase in public 
    sector productivity. 
    The World Bank launched the Multiphase Programmatic Approach (MPA) to support the 
    Government of Serbia in continuation of institutional, physical and operational modernization of 
    the railway sector in an integrated manner through providing financial support to Serbia Railway 
    Sector Modernization Project as part of the MPA to be implemented in three overlapping phases 
    over the ten-year period. 
    To finance Phase 1 of the Serbia Railway Sector Modernization Project (the Project), the 
    International Bank for Reconstruction and Development (IBRD), as part of the World Bank 
    Group, and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of 
    Serbia loans amounting to EUR 102 million. The Project consists of three components: 
     Component 1: Infrastructure Investments and Asset Management. This component 
    focuses on improving the quality and safety of railway infrastructure and enhancing rail 
    asset management practices. 
    
    2 
    
     Component 2: Institutional Strengthening and Project Management. This component 
    focuses on strengthening rail policies and institutions to deepen and sustain recent 
    reforms. 
     Component 3: Railway Modernization Enablers. This component finances measures to 
    protect the vulnerable and poor and strengthen sectoral enablers for sustainable business 
    growth and job creation. 
    The Project is managed by the MoCTI through its Project Implementation Unit (PIU) 
    supplemented by the Project Implementation Teams (PITs) in Railway Directorate (RD) and in 
    railway companies, respectively Serbian Railway Infrastructure (IZS) Serbia Cargo (SC) and 
    Serbia Voz (SV). PITs act as subordinate implementing agencies and provide technical support 
    for specific Project subcomponents or activities of the MPA that pertain to their area of expertise. 
    Primary responsibility for Project execution lies on PIU which will ensure that the Project 
    development objectives are met. 
    In this context, the MoCTI intends to develop a Study - Technical assistance to support Srbija 
    Voz to adopt commercially oriented marketing systems, framed under Component 3 of the 
    Project. These Terms of Reference (ToR) describe the Services to be undertaken by a consultancy 
    firm to provide technical assistance to SV to adopt commercially oriented marketing tools 
    through adoption of a Marketing 
  • REoI-SER-SRSM-QCBS-CS-22-43-Technical assistance IT strategy and digitalisation for SV.pdf · arhiva · 6.661 znakova
    Izvučeni tekst
    1 
    
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    Assignment Title: 
    Technical assistance for preparation of IT Strategy and Digitalization activities for Srbija 
    Voz (SV) 
    Reference No. SER-SRSM-QCBS-CS-22-43 
    
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase 
    Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and 
    the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million 
    loan to support enhancing the efficiency and safety of existing railway assets and improving governance 
    and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to 
    payments for consulting services to be procured under this project. 
    Scope of Work 
    The objective of the assignment is to provide technical assistance to SV to support the introduction of 
    business support through digitalization. This assignment will assist the GoS and SV to establish a 
    Strategic Framework for Digital Transformation with comprehensive action and investment plan. 
    The Scope of work is divided into two activities: 
     
    Activity 1: Current state of play and needs assessment; 
     
    Activity 2: Strategy for IT and Digitalization activities for SV 
    Activity 1: The objective of this task is to analyze current level of digitalization in SV and assess realistic 
    needs given the development trajectories in the sector and digital technology. 
    Task 1.1: Analyze current state of digitalization in SV 
    Task 1.2: Getting best practices 
    Task 1.3: Gap between observed and World best practices 
    Task 1.4: Dissemination event 
    Activity 2: Defining Strategy for IT and Digitalization activities for SV. 
    Task 2.1: Strategy framework for company digital transformation process 
    Task 2.2: Action plan for Digitalization activities for SV 
    Task 2.3: Identifying Priority activities 
    Task 2.4: GDPR 
    Task 2.5: Cybersecurity Guidelines 
    Task 2.6: Dissemination event 
    
    2 
    
     Contract duration: 10 months starting from the commencement date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of 
    the Ministry of Construction, Transport and Infrastructure (MoCTI) 
    https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and-
    marketing-strategy-sv 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their 
    interest in providing the Services. Interested Consultants should provide information demonstrating that 
    they have the required qualifications and relevant experience to perform the Services. 
    The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method 
    set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 
    2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible firms to whom 
    a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. 
    The assignment will require a qualified consulting company or Joint Venture that can demonstrate extensive 
    experience in technical assistance regarding digitalization service for the contract. Consultants may 
    associate with other firms to enhance their qualifications but should indicate clearly whether the association 
    is in the form of a joint venture (JV) and/or a sub-consultancy. In the case of a joint venture, all the partners 
    in the joint venture shall be jointly and severally liable for the entire contract, if selected. Furthermore, 
    Expressions of interest of JVs will be evaluated based on the composition of JV submitted, whereas the 
    experience of other firms not included in the JV will not be considered in the evaluation. The experience of 
    any proposed sub-consultancy
  • TOR-SER-SRSM-QCBS-CS-22-43-Technical_assistance_IT strategy and digitalisation for SV - jan 2023.pdf · arhiva · 35.319 znakova
    Izvučeni tekst
    1 
    
    The Serbia Railway Sector Modernization Project (SRSM) Project ID 
    No. P170868 
    TERMS OF REFERENCE 
    Technical assistance for preparation of IT Strategy and Digitalization 
    activities for Srbja Voz (SV) 
    1 Background information 
    1.1 Beneficiary country: Republic of Serbia 
    Client: Ministry of Construction, Transport, and Infrastructure of Republic of Serbia 
    (MoCTI). 
    Final Beneficiary: Srbija Voz (Company for Passenger Railway Transport – SV). 
    1.2 Relevant background 
    The Republic of Serbia is located at the crossroads of Central and Southeast Europe and 
    is the central part of the Balkans, spreading over an area of 88,361km2. As an upper 
    middle-income country with a Gross National Income per capita of US$ 7,409 (2019) and 
    a population of 7 million (2018), Serbia is one of the main economies of the Western 
    Balkans with positive economic performance in the last 5 years. 
    The country is ranked relatively high in terms of competitiveness, investment climate and 
    the ease of doing business. The World Economic Forum’s global competitiveness index 
    ranked Serbia at 72 out of 141 countries in 2019, behind regional peers Slovenia (35), 
    Bulgaria (49), Romania (51) and Croatia (63) but ahead of Montenegro (73) and Albania 
    (81). It is ranked 48th by the World Bank’s Doing Business Index 2019, where it scored 
    above regional average for Europe and Central Asia. Since 2014, the Government of the 
    Republic of Serbia (GoS) has made good progress in reducing public debt, including 
    through greater fiscal responsibility, reform of the public administration, reform of the 
    state-owned enterprises and an overall increase in public sector productivity. 
    The World Bank launched the Multiphase Programmatic Approach (MPA) to support the 
    Government of Serbia in continuation of institutional, physical and operational 
    modernization of the railway sector in an integrated manner through providing financial 
    support to Serbia Railway Sector Modernization Project as part of the MPA to be 
    implemented in three overlapping phases over the ten-year period. 
    To finance Phase 1 of the Serbia Railway Sector Modernization Project (the Project), the 
    International Bank for Reconstruction and Development (IBRD), as part of the World 
    Bank Group, and the Agence Francaise de Développement (AFD), jointly, granted to the 
    Republic of Serbia loans amounting to EUR 102 million. The Project consists of three 
    components: 
    ➢ Component 1: Infrastructure Investments and Asset Management. This 
    component focuses on improving the quality and safety of railway infrastructure 
    and enhancing rail asset management practices. 
    
    2 
    
    ➢ Component 2: Institutional Strengthening and Project Management. This 
    component focuses on strengthening rail policies and institutions to deepen and 
    sustain recent reforms. 
    ➢ Component 3: Railway Modernization Enablers. This component finances 
    measures to protect the vulnerable and poor and strengthen sectoral enablers for 
    sustainable business growth and job creation. 
    The Project is managed by the MoCTI through its Project Implementation Unit (PIU) 
    supplemented by the Project Implementation Teams (PITs) in Railway Directorate (RD) 
    and in railway companies, respectively Serbian Railway Infrastructure (IZS) Serbia 
    Cargo (SC) and Serbia Voz (SV). PITs act as subordinate implementing agencies and 
    provide technical support for specific Project subcomponents or activities of the MPA 
    that pertain to their area of expertise. Primary responsibility for Project execution lies on 
    PIU which will ensure that the Project development objectives are met. 
    In this context, the MoCTI intends to develop a Study - Technical assistance for 
    preparation of IT Strategy and Digitalization activities for SV, framed under Component 
    2 of the Project. The Terms of Reference (ToR) relate to consultancy firm for technical 
    assistance to SV to adopt commercially oriented, independent management and 
    modernize their internal structures and systems through w
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – IT Strategy and Marketing Strategy for SV 

Dokumenti: 

Contract Award Notice SER-SRSM-QCBS-CS-22-44-2.pdf

REoI-ToR SER-SRSM-QCBS-CS-22-44-2 - Marketing Strategy for SV NEW FEBRUARY 2024.pdf

Contract Award Notice - SER-SRSM-QCBS-CS-22-43.pdf

REoI-SER-SRSM-QCBS-CS-22-44- MARKETING STRATEGY FOR SV - EXTENSION.pdf

REoI-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf

ToR-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf

REoI-SER-SRSM-QCBS-CS-22-43-Technical assistance IT strategy and digitalisation for SV.pdf

TOR-SER-SRSM-QCBS-CS-22-43-Technical_assistance_IT strategy and digitalisation for SV - jan 2023.pdf
Povezani akti (8)

Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.