Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – IT Strategy and Marketing Strategy for SV
Ministarstvo građevinarstva, saobraćaja i infrastrukture
posle izbora
Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.
Šta možete da uradite
Vrsta akta još nije određena. Pogledajte katalog akcija.
Ključni podaci
- Oblast
- Građevinarstvo, saobraćaj, infrastruktura
- Vrsta dokumenta
- Konkurs, oglas
- Datum
- 2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)
Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.
Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
- resor iz izvora: infrastruktura
Prilozi (8)
- Contract Award Notice SER-SRSM-QCBS-CS-22-44-2.pdf · arhiva · 2.032 znakova
Izvučeni tekst
Contract Award Project: P170868-Serbia Railway Sector Modernization Loan/Credit/TF Info: IBRD-92210 Bid/Contract Reference No: SER-SRSM-QCBS-CS-22-44-2 Procurement Method: QCBS-Quality And Cost-Based Selection Scope of Contract: Technical assistance to support Srbija Voz to adopt commercially oriented marketing systems Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2024/08/28 Duration of Contract 12 Month(s) Minimum Qualifying Score 80 Awarded Firm(s): MAJO PUBLIC (600327) Dečanska 12, Belgrade Country: Serbia Beneficial Ownership Details Form Date: 22-AUG-24 Name Nationality Residence Country Conditions Met Maja Grcic YF Serbia Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of Name Nationality Residence Country Conditions Met the board of the directors or an equivalent Jovana Joksimovic YF Serbia Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent IPSOS STRATEGIC MARKETING DOO (669922) Country: Serbia Beneficial Ownership Details Form Date: 23-AUG-24 FULLHOUSE OGILVY ADVERTISING AGENCY (735488) Country: Serbia Beneficial Ownership Details Form Date: 23-AUG-24 Summary of Reason No owners meet conditions Scores Technical: 98.12 Methodology: 48.98 Key Personnel: 49.14 Financial: 20 Combined: 98.50 Rank: 1 Final Evaluation Price RSD 57417536.83 Signed Contract Price EUR 438975.00 Price: Currency: Amount: Euro (Euro) 438975.00 Evaluated Firm(s): RAIL CLUSTER FOR SOUTH EAST EUROPE (842403) Country: Serbia GREEN STAR TECH D.O.O. (842401) Country: Serbia MINERVA RAIL (842345) Country: United Kingdom Final Evaluation Price RSD 87491055.11 Price: Currency: Amount:
- REoI-ToR SER-SRSM-QCBS-CS-22-44-2 - Marketing Strategy for SV NEW FEBRUARY 2024.pdf · arhiva · 46.073 znakova
Izvučeni tekst
1 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical assistance to support Srbijavoz to adopt commercially oriented marketing systems Reference No. SER-SRSM-QCBS-CS-22-44-2 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The objective of the Assignment is to provide technical assistance (TA) to support SV to adopt commercially oriented marketing systems. This TA will assist: (i) the GoS and SV to identify user needs and preferences and (ii) SV to establish a Strategic Framework for modern marketing tools with comprehensive action and investment plan. The Scope of Work is divided into three activities: Activity 1: Identifying user needs and preferences Activity 2: Marketing Strategic framework for SV; Activity 3: Preparing an Action plan for the implementation of modern marketing tools Activity 1: Under this Activity the Consultant will conduct a series of user needs analysis, to serve as a basis for the development of Marketing strategy for SV and the accompanying Action plan. To this end under this activity the Consultant would provide an overview of the best modern marketing practices across the world, perform extensive user surveys across the country, define the desired state (KPI) for SV and identify gap between desired and observed as well as possible ways to reach the desired state including their costs and benefits, and conclude with the strategy that should support the SV to reach the desired state through modern marketing approaches. Task 1.1: Getting best practices Task 1.2: Analysis of the achieved business results SV from the status change until today and identification of resources for improvement trough modern marketing tools Task 1.3: Conduct user needs and preferences surveys and research Task 1.4: Proposals for improvement marketing tools Activity 2: Under this Activity the Consultant will develop the marketing strategy for SV with main focus on modern marketing tools and goal of attracting new users and increasing user satisfaction. 2 Task 2.1: Preparation of the Marketing Strategy of SV Activity 3: This Activity will be direct continuation of Activity 2 under this assignment, under which the Consultant will identify effective marketing tools and produce a detailed Action Plan for implementation of the Marketing Strategy. The Action Plan should also seek to include the expected costs, responsible stakeholders, and KPI through which the progress toward that goal could be monitored. Task 3.1: Multi-criteria analysis of identified effective specific marketing tools Task 3.2: Marketing Strategy Action plan with timeline and investment plan Task 3.3: Producing detailed integrated marketing campaigns (IMC) and marketing material Contract duration: 12 months starting from the commencement date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and- marketing-strategy-sv The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their interest in providing the Services. Interested Consultants should provide
- Contract Award Notice - SER-SRSM-QCBS-CS-22-43.pdf · arhiva · 1.934 znakova
Izvučeni tekst
Contract Award Project: P170868-Serbia Railway Sector Modernization Loan/Credit/TF Info: IBRD-92210 Bid/Contract Reference No: SER-SRSM-QCBS-CS-22-43 Procurement Method: QCBS-Quality And Cost-Based Selection Scope of Contract: Technical assistance for preparation of IT Strategy and Digitalization activities for Srbija Voz (SV) Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2024/01/23 Duration of Contract 10 Month(s) Minimum Qualifying Score 80 Awarded Firm(s): PRICEWATERHOUSECOOPERS D.O.O. SARAJEVO (735474) Country: Bosnia and Herzegovina IGMAKO SMART SOLUTIONS (675156) Omladinskih brigada 88-90, 11070 Belgrade Country: Serbia PRICEWATERHOUSECOOPERS CONSULTING D.O.O. (735502) Country: Serbia PRICEWATERHOUSECOOPERS ČESKÁ REPUBLIKA, S.R.O. (735503) Country: Czech Republic Scores Technical: 92.76 Methodology: 31.77 Key Personnel: 58.07 Participation by Nationals: 2.92 Financial: 100 Combined: 94.21 Rank: 1 Final Evaluation Price RSD 53809778.13 Signed Contract Price EUR 457458.00 Price: Currency: Amount: Euro (Euro) 457458.00 Evaluated Firm(s): MOTT MACDONALD ROMANIA SRL (407705) Country: Romania DEVELLOP D.O.O. (735501) Country: Serbia Final Evaluation Price RSD 69165146.40 Price: Currency: Amount: EGZAKTA DOO (735507) Country: Serbia FAKULTET ORGANIZACIONIH NAUKA (735499) Country: Serbia INFORMATIKA AD BEOGRAD (730216) Country: Serbia Final Evaluation Price RSD 57167789.51 Price: Currency: Amount: Rejected Firm(s): CIVITTA INTERNATIONAL OÜ (735490) Country: Estonia MC MOBILITY CONSULTANTS GMBH (472959) Country: Austria Final Evaluation Price Reason for Rejection Failure to meet minimum technical score Price: Currency: Amount: ASPIRO AS (735477) Country: Slovak Republic Final Evaluation Price Reason for Rejection Failure to meet minimum technical score Price: Currency: Amount:
- REoI-SER-SRSM-QCBS-CS-22-44- MARKETING STRATEGY FOR SV - EXTENSION.pdf · arhiva · 7.331 znakova
Izvučeni tekst
1 EXTENSION OF DEADLINE FROM FEBRUARY 20, 2023 TO FEBRUARY 27, 2023 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical assistance to support Srbija Voz to adopt commercially oriented marketing systems Reference No. SER-SRSM-QCBS-CS-22-44 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The objective of the Assignment is to provide technical assistance (TA) to support SV to adopt commercially oriented marketing systems. This TA will assist: (i) the GoS and SV to identify user needs and preferences and (ii) SV to establish a Strategic Framework for modern marketing tools with comprehensive action and investment plan. The Scope of Work is divided into two activities: Activity 1: Marketing Strategic framework for SV; Activity 2: Action plan for the implementation of modern marketing tools Activity 1: Under this Activity the Consultant will develop the marketing strategy for SV with main focus on modern marketing tools and goal of attracting new users and increasing user satisfaction. To this end under this activity the Consultant would provide an overview of the best modern marketing practices across the world, perform extensive user surveys across the country, define the desired state (KPI) for SV and identify gap between desired and observed as well as possible ways to reach the desired state including their costs and benefits, and conclude with the strategy that should support the SV to reach the desired state through modern marketing approaches. Strategy should also include the expected costs, responsible stakeholders, and KPI through which the progress toward that goal could be monitored. 2 Task 1.1: Getting best practices Task 1.2: Analysis of the achieved business results SV from the status change until today and identification of resources for improvement trough modern marketing tools Task 1.3: Conduct user needs and preferences surveys and research Task 1.4: Proposals for improvement marketing tools Task 1.5: Preparation of the Marketing Strategy of SV Activity 2: Action plan for the implementation of modern marketing tools. Task 2.1: Multi-criteria analysis of identified effective specific marketing tools Task 2.2: Marketing Strategy Action plan Contract duration: 12 months starting from the commencement date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and- marketing-strategy-sv The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible firms to whom a subsequent Request for Proposals (RFP), both technical and financial,
- REoI-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf · arhiva · 7.264 znakova
Izvučeni tekst
1 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical assistance to support Srbija Voz to adopt commercially oriented marketing systems Reference No. SER-SRSM-QCBS-CS-22-44 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The objective of the Assignment is to provide technical assistance (TA) to support SV to adopt commercially oriented marketing systems. This TA will assist: (i) the GoS and SV to identify user needs and preferences and (ii) SV to establish a Strategic Framework for modern marketing tools with comprehensive action and investment plan. The Scope of Work is divided into two activities: Activity 1: Marketing Strategic framework for SV; Activity 2: Action plan for the implementation of modern marketing tools Activity 1: Under this Activity the Consultant will develop the marketing strategy for SV with main focus on modern marketing tools and goal of attracting new users and increasing user satisfaction. To this end under this activity the Consultant would provide an overview of the best modern marketing practices across the world, perform extensive user surveys across the country, define the desired state (KPI) for SV and identify gap between desired and observed as well as possible ways to reach the desired state including their costs and benefits, and conclude with the strategy that should support the SV to reach the desired state through modern marketing approaches. Strategy should also include the expected costs, responsible stakeholders, and KPI through which the progress toward that goal could be monitored. Task 1.1: Getting best practices Task 1.2: Analysis of the achieved business results SV from the status change until today and identification of resources for improvement trough modern marketing tools Task 1.3: Conduct user needs and preferences surveys and research Task 1.4: Proposals for improvement marketing tools Task 1.5: Preparation of the Marketing Strategy of SV 2 Activity 2: Action plan for the implementation of modern marketing tools. Task 2.1: Multi-criteria analysis of identified effective specific marketing tools Task 2.2: Marketing Strategy Action plan Contract duration: 12 months starting from the commencement date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and- marketing-strategy-sv The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible firms to whom a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. The assignment will require a qualified consulting
- ToR-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf · arhiva · 36.292 znakova
Izvučeni tekst
1 The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 TERMS OF REFERENCE Technical assistance to support Srbija Voz to adopt commercially oriented marketing systems 1 Background information 1.1 Beneficiary country: Republic of Serbia Client: Ministry of Construction, Transport, and Infrastructure of Republic of Serbia (MoCTI). Final Beneficiary: Srbija Voz (Company for Passenger Railway Transport – SV). 1.2 Relevant background The Republic of Serbia is located at the crossroads of Central and Southeast Europe and is the central part of the Balkans, spreading over an area of 88,361km2. As an upper middle-income country with a Gross National Income per capita of US$ 7,409 (2019) and a population of 7 million (2018), Serbia is one of the main economies of the Western Balkans with positive economic performance in the last 5 years. The country is ranked relatively high in terms of competitiveness, investment climate and the ease of doing business. The World Economic Forum’s global competitiveness index ranked Serbia at 72 out of 141 countries in 2019, behind regional peers Slovenia (35), Bulgaria (49), Romania (51) and Croatia (63) but ahead of Montenegro (73) and Albania (81). It is ranked 48th by the World Bank’s Doing Business Index 2019, where it scored above regional average for Europe and Central Asia. Since 2014, the Government of the Republic of Serbia (GoS) has made good progress in reducing public debt, including through greater fiscal responsibility, reform of the public administration, reform of the state-owned enterprises and an overall increase in public sector productivity. The World Bank launched the Multiphase Programmatic Approach (MPA) to support the Government of Serbia in continuation of institutional, physical and operational modernization of the railway sector in an integrated manner through providing financial support to Serbia Railway Sector Modernization Project as part of the MPA to be implemented in three overlapping phases over the ten-year period. To finance Phase 1 of the Serbia Railway Sector Modernization Project (the Project), the International Bank for Reconstruction and Development (IBRD), as part of the World Bank Group, and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia loans amounting to EUR 102 million. The Project consists of three components: Component 1: Infrastructure Investments and Asset Management. This component focuses on improving the quality and safety of railway infrastructure and enhancing rail asset management practices. 2 Component 2: Institutional Strengthening and Project Management. This component focuses on strengthening rail policies and institutions to deepen and sustain recent reforms. Component 3: Railway Modernization Enablers. This component finances measures to protect the vulnerable and poor and strengthen sectoral enablers for sustainable business growth and job creation. The Project is managed by the MoCTI through its Project Implementation Unit (PIU) supplemented by the Project Implementation Teams (PITs) in Railway Directorate (RD) and in railway companies, respectively Serbian Railway Infrastructure (IZS) Serbia Cargo (SC) and Serbia Voz (SV). PITs act as subordinate implementing agencies and provide technical support for specific Project subcomponents or activities of the MPA that pertain to their area of expertise. Primary responsibility for Project execution lies on PIU which will ensure that the Project development objectives are met. In this context, the MoCTI intends to develop a Study - Technical assistance to support Srbija Voz to adopt commercially oriented marketing systems, framed under Component 3 of the Project. These Terms of Reference (ToR) describe the Services to be undertaken by a consultancy firm to provide technical assistance to SV to adopt commercially oriented marketing tools through adoption of a Marketing
- REoI-SER-SRSM-QCBS-CS-22-43-Technical assistance IT strategy and digitalisation for SV.pdf · arhiva · 6.661 znakova
Izvučeni tekst
1 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical assistance for preparation of IT Strategy and Digitalization activities for Srbija Voz (SV) Reference No. SER-SRSM-QCBS-CS-22-43 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The objective of the assignment is to provide technical assistance to SV to support the introduction of business support through digitalization. This assignment will assist the GoS and SV to establish a Strategic Framework for Digital Transformation with comprehensive action and investment plan. The Scope of work is divided into two activities: Activity 1: Current state of play and needs assessment; Activity 2: Strategy for IT and Digitalization activities for SV Activity 1: The objective of this task is to analyze current level of digitalization in SV and assess realistic needs given the development trajectories in the sector and digital technology. Task 1.1: Analyze current state of digitalization in SV Task 1.2: Getting best practices Task 1.3: Gap between observed and World best practices Task 1.4: Dissemination event Activity 2: Defining Strategy for IT and Digitalization activities for SV. Task 2.1: Strategy framework for company digital transformation process Task 2.2: Action plan for Digitalization activities for SV Task 2.3: Identifying Priority activities Task 2.4: GDPR Task 2.5: Cybersecurity Guidelines Task 2.6: Dissemination event 2 Contract duration: 10 months starting from the commencement date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-it-strategy-and- marketing-strategy-sv The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 2017, August 2018 and November 2020). The Client, intends to shortlist up to eight eligible firms to whom a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. The assignment will require a qualified consulting company or Joint Venture that can demonstrate extensive experience in technical assistance regarding digitalization service for the contract. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture (JV) and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. Furthermore, Expressions of interest of JVs will be evaluated based on the composition of JV submitted, whereas the experience of other firms not included in the JV will not be considered in the evaluation. The experience of any proposed sub-consultancy
- TOR-SER-SRSM-QCBS-CS-22-43-Technical_assistance_IT strategy and digitalisation for SV - jan 2023.pdf · arhiva · 35.319 znakova
Izvučeni tekst
1 The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 TERMS OF REFERENCE Technical assistance for preparation of IT Strategy and Digitalization activities for Srbja Voz (SV) 1 Background information 1.1 Beneficiary country: Republic of Serbia Client: Ministry of Construction, Transport, and Infrastructure of Republic of Serbia (MoCTI). Final Beneficiary: Srbija Voz (Company for Passenger Railway Transport – SV). 1.2 Relevant background The Republic of Serbia is located at the crossroads of Central and Southeast Europe and is the central part of the Balkans, spreading over an area of 88,361km2. As an upper middle-income country with a Gross National Income per capita of US$ 7,409 (2019) and a population of 7 million (2018), Serbia is one of the main economies of the Western Balkans with positive economic performance in the last 5 years. The country is ranked relatively high in terms of competitiveness, investment climate and the ease of doing business. The World Economic Forum’s global competitiveness index ranked Serbia at 72 out of 141 countries in 2019, behind regional peers Slovenia (35), Bulgaria (49), Romania (51) and Croatia (63) but ahead of Montenegro (73) and Albania (81). It is ranked 48th by the World Bank’s Doing Business Index 2019, where it scored above regional average for Europe and Central Asia. Since 2014, the Government of the Republic of Serbia (GoS) has made good progress in reducing public debt, including through greater fiscal responsibility, reform of the public administration, reform of the state-owned enterprises and an overall increase in public sector productivity. The World Bank launched the Multiphase Programmatic Approach (MPA) to support the Government of Serbia in continuation of institutional, physical and operational modernization of the railway sector in an integrated manner through providing financial support to Serbia Railway Sector Modernization Project as part of the MPA to be implemented in three overlapping phases over the ten-year period. To finance Phase 1 of the Serbia Railway Sector Modernization Project (the Project), the International Bank for Reconstruction and Development (IBRD), as part of the World Bank Group, and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia loans amounting to EUR 102 million. The Project consists of three components: ➢ Component 1: Infrastructure Investments and Asset Management. This component focuses on improving the quality and safety of railway infrastructure and enhancing rail asset management practices. 2 ➢ Component 2: Institutional Strengthening and Project Management. This component focuses on strengthening rail policies and institutions to deepen and sustain recent reforms. ➢ Component 3: Railway Modernization Enablers. This component finances measures to protect the vulnerable and poor and strengthen sectoral enablers for sustainable business growth and job creation. The Project is managed by the MoCTI through its Project Implementation Unit (PIU) supplemented by the Project Implementation Teams (PITs) in Railway Directorate (RD) and in railway companies, respectively Serbian Railway Infrastructure (IZS) Serbia Cargo (SC) and Serbia Voz (SV). PITs act as subordinate implementing agencies and provide technical support for specific Project subcomponents or activities of the MPA that pertain to their area of expertise. Primary responsibility for Project execution lies on PIU which will ensure that the Project development objectives are met. In this context, the MoCTI intends to develop a Study - Technical assistance for preparation of IT Strategy and Digitalization activities for SV, framed under Component 2 of the Project. The Terms of Reference (ToR) relate to consultancy firm for technical assistance to SV to adopt commercially oriented, independent management and modernize their internal structures and systems through w
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – IT Strategy and Marketing Strategy for SV Dokumenti: Contract Award Notice SER-SRSM-QCBS-CS-22-44-2.pdf REoI-ToR SER-SRSM-QCBS-CS-22-44-2 - Marketing Strategy for SV NEW FEBRUARY 2024.pdf Contract Award Notice - SER-SRSM-QCBS-CS-22-43.pdf REoI-SER-SRSM-QCBS-CS-22-44- MARKETING STRATEGY FOR SV - EXTENSION.pdf REoI-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf ToR-SER-SRSM-QCBS-CS-22-44-MARKETING STRATEGY FOR SV.pdf REoI-SER-SRSM-QCBS-CS-22-43-Technical assistance IT strategy and digitalisation for SV.pdf TOR-SER-SRSM-QCBS-CS-22-43-Technical_assistance_IT strategy and digitalisation for SV - jan 2023.pdf
Povezani akti (8)
- Request for Quotation (RFQ) Purchasing of SUV Vehicle and Mid-size/large car (D-segment) for PIU for LIID · 2.11.2026.
- ODLUKA O SPROVOĐENJU POSTUPKA ZA DODELU SREDSTAVA KAO STIMULATIVNIH MERA PUTEM JAVNOG POZIVA ZA UNAPREĐENJE KOMBINOVANOG TRANSPORTA ZA 2024. GODINU · 9.9.2024.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – TECHNICAL ASSISTANCE FOR MAINTENANCE OUTSOURCING CONTRACT · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Site Supervision for Works – Belgrade Centre Railway Station · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – CREWS SCHEDULING INFORMATION SYSTEM FOR SRBIJAVOZ · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – ESIA FRAMEWORK AGREEMENT · 2.11.2026.
- WESTERN BALKANS TRADE AND TRANSPORT FACILITATION PROJECT (WBTTF) – DESIGN, SUPPLY AND INSTALLATION OF NATIONAL SINGLE WINDOW SYSTEM · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE · 2.11.2026.
Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.