Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Technical assistance for Directorate for Railway
Ministarstvo građevinarstva, saobraćaja i infrastrukture
posle izbora
Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.
Šta možete da uradite
Vrsta akta još nije određena. Pogledajte katalog akcija.
Ključni podaci
- Oblast
- Građevinarstvo, saobraćaj, infrastruktura
- Vrsta dokumenta
- Konkurs, oglas
- Datum
- 2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)
Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.
Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
- resor iz izvora: infrastruktura
Prilozi (4)
- Contract Award.pdf · arhiva · 1.476 znakova
Izvučeni tekst
Contract Award Project: P170868-Serbia Railway Sector Modernization Loan/Credit/TF Info: IBRD-92210 Bid/Contract Reference No: SER-SRSM-QCBS-CS-22-45-2 Procurement Method: QCBS-Quality And Cost-Based Selection Scope of Contract: Technical assistance for strengthening capacity of the Directorate for Railways Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2024/07/25 Duration of Contract 8 Month(s) Minimum Qualifying Score 80 Awarded Firm(s): EGIS D.O.O. BEOGRAD (639391) Country: Serbia Beneficial Ownership Details Form Date: 27-NOV-23 Summary of Reason there is no Beneficial Owner meeting the conditions PANTEIA B.V. (557250) Country: Netherlands Beneficial Ownership Details Form Date: 08-JUL-24 Summary of Reason there is no Beneficial Owner meeting the conditions EGIS RAIL (431493) 168-170 Avenue Thiers 69455, Lyon Cedex 06 - France Country: France Beneficial Ownership Details Form Date: 27-NOV-23 Summary of Reason there is no Beneficial Owner meeting the conditions Scores Technical: 96.64 Methodology: 39.58 Key Personnel: 52.06 Transfer of Knowledge: 5 Financial: 100 Combined: 97.31 Rank: 1 Final Evaluation Price RSD 30471610.00 Signed Contract Price EUR 260000.00 Price: Currency: Amount: Euro (Euro) 260000.00 Evaluated Firm(s): SGS (818416) Country: Spain SGS BEOGRAD (601346) Country: Serbia Final Evaluation Price RSD 46779664.08 Price: Currency: Amount:
- REoI-ToR SER-SRSM-QCBS-CS-22-45-2 - TA Directorate for Railways.pdf · arhiva · 50.084 znakova
Izvučeni tekst
REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical assistance for strengthening capacity of the Directorate for Railways Reference No. SER-SRSM-QCBS-CS-22-45-2 The Republic of Serbia has received a Loan from the International Bank for Reconstruction and Development (IBRD) in the amount of EURO 51 million and from the Agence Francaise de Développement (AFD) in the amount of EURO 51 million, toward the cost of the Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA) and intends to apply part of the proceeds to payments for consulting services for Technical Assistance for to strengthen the Directorate for Railways. The consulting services (“the Services”) include are divided into two activities: Activity 1: Proposal for an optimal organizational structure of the Directorate for Railways as the railway regulator in Serbia; Activity 2: Training and technical support for improving the Directorate for Railways capacity. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI): https://www.mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm- technical-assistance-directorate-railway The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The Consultant firm will be selected in accordance with QCBS (Quality-and Cost-Based Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 2017, August 2018 and November 2020). The Client intends to shortlist up to eight eligible firms to whom a subsequent Request for Proposals (RFP), both technical and financial, shall be sent. The assignment will require a qualified consulting company or Joint Venture that can demonstrate extensive experience in the regulation of the rail market and also rail safety field. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture (JV) and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. Furthermore, Expressions of interest of JVs will be evaluated based on the composition of JV submitted, whereas the experience of other firms not included in the JV will not be considered in the evaluation. The experience of any proposed sub-consultancy shall not be included in the evaluation. The following shortlisting criteria will be applied to all consulting firms that have submitted EoI: The Consulting firm must be a legal entity. i) General Experience: Experience in rail transport, with at least two projects of rail transport in the past 8 years. ii) Specific Experience: The Consultant (individual company or joint venture altogether) has implemented and successfully completed, during the last five years (from the January 2018 up to the deadline for the receipt of applications indicated below): at least one (1) contract in a field related to railway market regulation in Europe, at least one (1) contract in the field of railway safety in Europe. iii) Availability of qualified experts within the organization/JV with relevant experience in the field, such as railway market regulation, passenger rights, railway safety, etc. As evidence of the general and specific experience, the Consultant firm shall prepare a table listing following information: name
- REoI-SER-SRSM-QCBS-CS-22-45-TA for Raiway Directorate.pdf · arhiva · 7.740 znakova
Izvučeni tekst
1 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Technical assistance for strengthening capacity of the Directorate for Railways Reference No. SER-SRSM-QCBS-CS-22-45 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The objective of the Assignment is to provide technical assistance (TA) to strengthen the Directorate for Railways and improve its efficiency and results. The Scope of Work is divided into two activities: • Activity 1: Proposal for an optimal organizational structure of the Directorate for Railways as the railway regulator in Serbia; Task 1.1: Getting best practices The objective of this task is to get an overview of the EU best practices in the area of the organizational structure of the relevant authorities and bodies in the railway sector provided for by the railway legislation of the European Union. Task 1.2: Defining an optimal internal organization of the Directorate for Railways The Consultant will analyze the organizational structure of the Directorate for Railways, i.e. its internal organization and administrative and human resources capacities, and, based on the analysis conducted within Task 1.1 and an alternative analysis, propose possible changes to the organizational structure of the Directorate for Railways so that it can more effectively fulfill its goals and responsibilities. • Activity 2: Training and technical support for improving the Directorate for Railways capacity.. Task 2.1: Knowledge transfer and training of employees in the Directorate for Railways regarding procedures for control of track access charges The Consultant will organize the training of employees in the Directorate for Railways regarding the main procedures for control of track access charges. Task 2.2: Knowledge transfer and training of employees in the Directorate for Railways regarding powers and actions of the body responsible for the enforcement of the Regulation (EC) No 1371/2007 on rail passengers’ rights and obligations regarding Article 28 of this Regulation The Consultant will organize the training of employees in the Directorate for Railways in the area of rail passengers’ rights and obligations. 2 Task 2.3: Knowledge transfer and training of employees in the Directorate for Railways regarding issuing of authorizations for placing in service of fixed structural subsystems The Consultant will organize the training of employees in the Directorate for Railways regarding issuing of authorizations for placing in service of fixed structural subsystems. Task 2.4: Knowledge transfer and training of employees in the Directorate for Railways regarding NSA procedures within issuance and supervision of safety certificates / safety authorizations Contract duration for both Components: 8 months starting from the commencement date. The detailed Terms of Reference for the above referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-technical-assistance- directorate-railway The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their interest in providing the Services. Interested Consultants sh
- TOR_TA for straightening capacity of the Directorate for Railways_jan 23.pdf · arhiva · 47.333 znakova
Izvučeni tekst
1 The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 TERMS OF REFERENCE Technical assistance for strengthening capacity of the Directorate for Railways 1 Background information 1.1 Beneficiary country: Republic of Serbia Client: Ministry of Construction, Transport, and Infrastructure of Republic of Serbia (MCoTI). Final Beneficiary: Directorate for Railways (Regulatory Body). 1.2 Relevant background To finance a first phase of the Serbia Railway Sector Modernization Project (the Project), the International Bank for Reconstruction and Development (IBRD), as part of the World Bank Group, and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia loans amounting to EUR 102 million. The Project consists of three components: ➢ Component 1: Infrastructure Investments and Asset Management. This component focuses on improving the quality and safety of railway infrastructure and enhancing rail asset management practices. ➢ Component 2: Institutional Strengthening and Project Management. This component focuses on strengthening rail policies and institutions to deepen and sustain recent reforms. ➢ Component 3: Railway Modernization Enablers. This component finances measures to protect the vulnerable and poor and strengthen sectoral enablers for sustainable business growth and job creation. The Project is managed by the MCoTI through its Project Implementation Unit (PIU) supplemented by the Project Implementation Teams (PITs) in the Directorate for Railways and in railway companies, respectively Serbian Railway Infrastructure, Serbia Cargo and Serbia Voz. PITs act as subordinate implementing agencies and provide technical support for specific Project subcomponents or activities of the MPA that pertain to their area of expertise. Primary responsibility for Project execution lies on PIU which will ensure that the Project development objectives are met. In this context, the MCoTI intends to develop a Technical assistance for strengthening capacity of the Directorate for Railways, framed under Component 2 of the Project. These Terms of Reference (ToR) describe the technical assistance to strengthen the Directorate for Railways. 2 1.3 General information In the process of the reform, introduction of competition and establishing of a single market in the railway sector, EU member states have gradually established several different bodies and authorities needed for the functioning of the railway market and the achievement of a high level of railway safety and interoperability, such as: regulatory bodies (railway market regulators), national safety authorities (NSAs), licensing authorities, national enforcement bodies for rail transport, etc. Those bodies and authorities are responsible for regulating and monitoring of the railway market, for railway safety and interoperability. The way of organization of those railway sector bodies and authorities differs from country to country as in some countries they are separated, while in others they are all, or some part of them, within one body. In the Republic of Serbia, these roles are entrusted to Directorate for Railways, the special organization of the state administration of the Republic of Serbia. In accordance with the relevant EU railway legislation, transposed in the national laws, the Directorate for Railways has the role of a railway market regulatory body, licensing authority, national safety authority and national enforcement body for rail transport. In addition, Directorate has competencies related to the operation of cableways and metro. The Directorate for Railways was established in 2005. It performed tasks prescribed by the Law on Railways ("Official Gazette of RS", number 18/05) and had 49 employees. By the adoption of the new Law on Railways ("Official Gazette of the RS", No. 41/18) as well as the Law on Safety in Railway Traffic ("Official Gazette of the RS", N
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Technical assistance for Directorate for Railway Dokumenti: Contract Award.pdf REoI-ToR SER-SRSM-QCBS-CS-22-45-2 - TA Directorate for Railways.pdf REoI-SER-SRSM-QCBS-CS-22-45-TA for Raiway Directorate.pdf TOR_TA for straightening capacity of the Directorate for Railways_jan 23.pdf
Povezani akti (8)
- Request for Quotation (RFQ) Purchasing of SUV Vehicle and Mid-size/large car (D-segment) for PIU for LIID · 2.11.2026.
- ODLUKA O SPROVOĐENJU POSTUPKA ZA DODELU SREDSTAVA KAO STIMULATIVNIH MERA PUTEM JAVNOG POZIVA ZA UNAPREĐENJE KOMBINOVANOG TRANSPORTA ZA 2024. GODINU · 9.9.2024.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – TECHNICAL ASSISTANCE FOR MAINTENANCE OUTSOURCING CONTRACT · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Site Supervision for Works – Belgrade Centre Railway Station · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – CREWS SCHEDULING INFORMATION SYSTEM FOR SRBIJAVOZ · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – ESIA FRAMEWORK AGREEMENT · 2.11.2026.
- WESTERN BALKANS TRADE AND TRANSPORT FACILITATION PROJECT (WBTTF) – DESIGN, SUPPLY AND INSTALLATION OF NATIONAL SINGLE WINDOW SYSTEM · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE · 2.11.2026.
Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.