Sajt nastaje poluautomatski: AI prikuplja akte i predlaže ocene, a tim ljudi ih pregledava. Nije prošao pravni pregled: sadržaj uzmite sa rezervom; sugestije i ispravke šaljite na kontakt@tehnickavlada.rs
Tehnička vlada

← Svi akti · Infrastruktura

Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.

Local Infrastructure and Institutional Development Project (LIID) – Deputy Head of PIU (Individual Consultants)

Ministarstvo građevinarstva, saobraćaja i infrastrukture

posle izbora

Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.

Šta možete da uradite

Vrsta akta još nije određena. Pogledajte katalog akcija.

Ključni podaci

Oblast
Građevinarstvo, saobraćaj, infrastruktura
Vrsta dokumenta
Konkurs, oglas
Datum
2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)

Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.

Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
  • resor iz izvora: infrastruktura
Prilozi (1)
  • REoI-ToR_SER-SRSM-IC-CS-21-17-2-Deputy Manager of PIU for LIID Project 23112022.docx · arhiva · 27.278 znakova
    Izvučeni tekst
    REQUEST FOR EXPRESSIONS OF INTEREST
    CONSULTING SERVICES – INDIVIDUAL CONSULTANTS
    Republic of Serbia
    The Serbia Railway Sector Modernization Project (SRSM)
    Project ID No. P170868
    Assignment Title:
    Individual Consultant (full time) – Deputy Manager of Project Implementation Unit for Serbia Local Infrastructure and Institutional Development Project
    Reference No. SER-SRSM-IC-CS-21-17-2
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the MPA, IBRD and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector and the Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. 
    Scope of Work
    The scope of work of the Deputy Manager of the PIU shall include, but not be limited to the following:
    
    Support the Manager of the PIU in organizing, coordinating, integrating, and monitoring operations of the PIU and the institutions involved in the Project, both at the PIU premises and in the field, during its preparation and implementation; 
    Providing advice and assisting the Manager of the PIU on substantive matters in particular related to implementation of component 1 and related to the infrastructure investments, engineering, mobility planning and local road management, and integration of the environmental dimension in the Project activities, strategic planning, resource mobilization, and the development of management tools to enhance the performance of the PIU;
    Support the Manager of the PIU in ensuring timely preparation and implementation of the Project Procurement Plan, as well as other relevant documentation, and drafting and submission of reports and requests for disbursement of the Project funds;
    Manage development and implementation of Terms of Reference, organize efficient monitoring of technical assistance and awarded grants;
    Play an active role in facilitating cooperation with LSGs, including working closely with them and other partners on the preparation of project proposals, preparation of designs, proper supervision, and the implementation of selected projects;
    Be responsible for managing technical/engineering staff in the PIU and delegating work related to implementation of the component 1 of the Project, including but not limited to investment project selection, support to PIU to proper selection and preparation of the projects, ensuring safeguard documents are properly prepared and implemented, ensuring works are implemented as per the contractual arrangements and Bank policies, etc.; 
    Support LSGs in preparation and delivery of TAs under Component 1 including, but not limited to, development of sustainable urban mobility plans, introduction of road asset management systems, local road management, and various analytics in the area of road safety and gender, identification of the pipeline of projects, smart mobility pilots, and participation in transport infrastructure service delivery related trainings and community of practices; 
    Coordinate with the focal points in the Ministries, agencies and other Project partners responsible for monitoring and reporting on implementation in their respective entities;
    Support the Manager of the PIU in overseeing day-to-day activities of the PIU, evaluate performance and operational effectiveness (including ongoing staff evaluation and feedback on their performance), and recommend changes where necessary;
    Develop and supervise implementation of standardized administrative and operating procedures for the PIU, including but not limited to maintenance of record-keeping and data storage systems; accounting and reporting formats for financial transactions of the project; procurement and contract monitoring system, etc.;
    Support the Manager of the PIU in regular monitoring of Project activities
Tekst objave
Local Infrastructure and Institutional Development Project (LIID) – Deputy Head of PIU (Individual Consultants)

Dokumenti: 

REoI-ToR_SER-SRSM-IC-CS-21-17-2-Deputy Manager of PIU for LIID Project 23112022.docx
Povezani akti (8)

Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.