Nizak mašinska ocena, nije pregledano izmenjeno 2.11.2026.
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Technical documentation for Bogojevo rail junction
Ministarstvo građevinarstva, saobraćaja i infrastrukture
posle izbora
Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.
Šta možete da uradite
Vrsta akta još nije određena. Pogledajte katalog akcija.
Ključni podaci
- Oblast
- Građevinarstvo, saobraćaj, infrastruktura
- Vrsta dokumenta
- Konkurs, oglas
- Datum
- 2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)
Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.
Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
- resor iz izvora: infrastruktura
Prilozi (1)
- SER-SRSM-QCBS-CS-21-23-2-REoI_Bogojevo rail junction 02092022.pdf · arhiva · 81.166 znakova
Izvučeni tekst
1 REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES – FIRMS SELECTION Republic of Serbia The Serbia Railway Sector Modernization Project (SRSM) Project ID No. P170868 Assignment Title: Preparation of the technical documentation, technical design review, and site supervision of works for the construction of the connection line (triangle) in the Bogojevo rail junction Reference No. SER-SRSM-QCBS-CS-21-23-2 For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety of existing railway assets and improving governance and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting services to be procured under this project. Scope of Work The Consultant shall carry out the specific tasks and activities as listed below and develop a well-functioning co-operation mechanism with MoCTI, the PIU and IZS/PIT on the basis of the following principles: a) Consultation and consent - the responsibilities for the general implementation of the Project are delegated to the PIU. MoCTI is the Client for this Contract. The PIU/MoCTI and the IZS through its nominated Project Implementation team (PIT) shall be involved in the decision-making processes regarding the Contract implementation and shall be kept informed in all stages related to contract(s) monitoring and implementation. IZS is the final beneficiary of the contract and they should be satisfied with all results and outputs. The cooperation with the final beneficiary will be sustained and managed by the PIU; b) The involvement of the IZS's PIT in the head office on the day-to-day activities together with the Consultant’s staff is crucial; c) Efficiency - the cooperation with the IZS's PIT and PIU/MoCTI shall be designed to avoid any delay or discontinuity in the decision making process or any dilution of the Consultant’s responsibility. The Consultant is required to provide professional inputs, advices and support during execution of his tasks. The Scope of Work is divided into two Phases: • Phase 1 – Design Phase that includes activities relevant for the preparation of Detailed Regulation Plan, Preliminary Solution, Preliminary Design with Feasibility Study, Environmental Impact Assessment Study and Technical Specification for next stage, and 2 • Phase 2: Supervision and Works Contract administration during which the Consultant shall provide full supervisory services during construction of works in accordance with the WB Conditions of Contract Design and Build. Phase 1 assumes the following activities: • Activity 1.1: Inception period • Activity 1.2: Preparation of the Detailed Regulation Plan • Activity 1.3: Preparation of the Preliminary Solution • Activity 1.4: Preparation of the Feasibility Study with Preliminary Design • Activity 1.5: Preparation of the Environmental Impact Assessment Study • Activity 1.6: Technical support to Contractor procurement Phase 2 assumes the following activities: • Activity 2.1: Pre-construction activities • Activity 2.2: Supervision of Construction activities • Activity 2.3: Installation activities • Activity 2.4: Completion and hand-over activities Contract duration for both Phases: 20 months starting from the commencement date. The detailed Terms of Reference for the above-referenced consulting services is posted on the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) https://www.mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-technical- documentation-bogojevo-rail The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indica
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Technical documentation for Bogojevo rail junction Dokumenti: SER-SRSM-QCBS-CS-21-23-2-REoI_Bogojevo rail junction 02092022.pdf
Povezani akti (8)
- Request for Quotation (RFQ) Purchasing of SUV Vehicle and Mid-size/large car (D-segment) for PIU for LIID · 2.11.2026.
- ODLUKA O SPROVOĐENJU POSTUPKA ZA DODELU SREDSTAVA KAO STIMULATIVNIH MERA PUTEM JAVNOG POZIVA ZA UNAPREĐENJE KOMBINOVANOG TRANSPORTA ZA 2024. GODINU · 9.9.2024.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – TECHNICAL ASSISTANCE FOR MAINTENANCE OUTSOURCING CONTRACT · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – Site Supervision for Works – Belgrade Centre Railway Station · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – CREWS SCHEDULING INFORMATION SYSTEM FOR SRBIJAVOZ · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – ESIA FRAMEWORK AGREEMENT · 2.11.2026.
- WESTERN BALKANS TRADE AND TRANSPORT FACILITATION PROJECT (WBTTF) – DESIGN, SUPPLY AND INSTALLATION OF NATIONAL SINGLE WINDOW SYSTEM · 2.11.2026.
- SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) – DESIGN FOR RUMA ŠABAC BOSNIAN BORDER RAILWAY LINE · 2.11.2026.
Izvor: mgsi.gov.rs Arhivirane kopije: 2.11.2026., 2.11.2026. U popisu od 2.11.2026.