SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) - Rail Infrastructure Asset Management System (CONUSLTING SERVICES)

Ministarstvo građevinarstva, saobraćaja i infrastrukture

posle izbora

Ovaj akt još nije pregledao čovek. Nivo je procenjen mašinski prema pravilima i ne predstavlja naš stav.

Šta možete da uradite

Vrsta akta još nije određena. Pogledajte katalog akcija.

Ključni podaci

Oblast
Građevinarstvo, saobraćaj, infrastruktura
Vrsta dokumenta
Konkurs, oglas
Datum
2.11.2026.prvog uočavanja
Kako smo ocenili (rizik: 5 od 100)

Ocena je dobijena mašinski prema pravilima iz metodologije. Metodologija.

Nadležnostda li akt sme da se donese u tehničkom mandatu 5 od 30 Vezivanje budućnostitrajanje, vrednost, nepovratnost 0 od 30 Procedurarok, objava, plan, period posle izbora 0 od 25 Korisnikpodaci iz registara 0 od 15
  • resor iz izvora: infrastruktura
Prilozi (2)
  • SER SRSM_QCBS-CS-21-22 _REoI Techical Advisory RiAMS_08082022_EXTENSION of TIME.pdf · arhiva · 7.172 znakova
    Izvučeni tekst
    1 
    
    DEADLINE EXTENSION 
    from August 15, 2022, to September 5, 2022 
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    Assignment Title: 
    Technical Advisory for the preparation of Technical Specifications for the Procurement 
    and Implementation of a Rail Infrastructure Asset Management System Implementation 
    (RI-AMS) and the state-of-the-art analysis of the environment for its implementation 
    Reference No. SER-SRSM-QCBS-CS-21-22 
    
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the Multiphase 
    Programmatic Approach (MPA), the International Bank for Reconstruction and Development (IBRD) and 
    the Agence Francaise de Développement (AFD), jointly, granted to the Republic of Serbia EUR 102 million 
    loan to support enhancing the efficiency and safety of existing railway assets and improving governance 
    and institutional capacity of the railway sector. Republic of Serbia intends to apply part of the proceeds to 
    payments for consulting services to be procured under this project. 
    Scope of Work 
    The objectives of the Services are to develop technical specification for the RI-AMS for Railway 
    Infrastructure company and support the company during RI-AMS procurement and implementation. This 
    will be achieved through: (1) state-of-the-art analysis of the existing RI-AMS environment at IZS and 
    propose necessary intervention for its improvements; (2) through needs assessment with recommendations 
    for necessary improvements of RI-AMS practices and a roadmap for RI-AMS rolling out with corresponding 
    action plan, timelines, cost estimation and clear responsibilities; (3) development of Technical 
    Specifications for the implementation of the RI-AMS system, and (5) provision of support to the Railway 
    Infrastructure company in procurement and RI-AMS implementation stage. 
    The Scope of Work is divided into two Components: 
    • 
    Component 1: RI-AMS Design stage that includes Activities from 1 to 5 which will be performed as 
    Lump Sum payments with milestones against submission of deliverables and, 
    • 
    Component 2: RI-AMS Procurement and Implementation stage that includes Activity 6 which will 
    be performed as Time Based payments with periodic payments against time actually spent on the 
    services. 
    
    2 
    
     Component 1 assumes the following activities: 
    • 
    Activity 1: Inception 
    • 
    Activity 2 Analysis of the current State-of-Play and State-of-Practice 
    • 
    Activity 3: Rail Asset Management Needs assessment and roadmap for introduction of fully 
    functioning road asset management system 
    • 
    Activity 4: Preparation of Implementation plan and Technical Specifications for RI-AMS 
    • 
    Activity 5: RI-AMS Trainings 
    Component 2 assumes the following activities: 
    • 
    Activity 6: Procurement and Implementation supervision support 
    Contract duration for both Components: 24 months starting from the commencement date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on the website of 
    the Ministry of Construction, Transport and Infrastructure (MoCTI) 
    https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-rail-infrastructure-
    asset-management 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants to indicate their 
    interest in providing the Services. Interested Consultants should provide information demonstrating that 
    they have the required qualifications and relevant experience to perform the Services. 
    The Consultant firm will be selected in accordance with QCBS (Quality and Cost Based Selection) method 
    set out in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016, revised November 
    2017, August 2018 and November 2020). 
    The assignment will require a qualified consulting company or consortium that can demonstrate extensive 
    experience in Technical assistance service for the contrac
  • SER SRSM_QCBS-CS-21-22 _REoI Techical Advisory RiAMS_18072022.pdf · arhiva · 86.348 znakova
    Izvučeni tekst
    REQUEST FOR EXPRESSIONS OF INTEREST 
    CONSULTING SERVICES – FIRMS SELECTION 
    
    Republic of Serbia 
    The Serbia Railway Sector Modernization Project (SRSM) 
    Project ID No. P170868 
    
    Assignment Title: 
    Technical Advisory for the preparation of Technical Specifications for the 
    Procurement and Implementation of a Rail Infrastructure Asset Management 
    System Implementation (RI-AMS) and the state-of-the-art analysis of the 
    environment for its implementation 
    Reference No. SER-SRSM-QCBS-CS-21-22 
    
    For the purpose of financing Serbia Railway Sector Modernization Project, Phase 1 of the 
    Multiphase Programmatic Approach (MPA), the International Bank for Reconstruction and 
    Development (IBRD) and the Agence Francaise de Développement (AFD), jointly, granted to 
    the Republic of Serbia EUR 102 million loan to support enhancing the efficiency and safety 
    of existing railway assets and improving governance and institutional capacity of the railway 
    sector. Republic of Serbia intends to apply part of the proceeds to payments for consulting 
    services to be procured under this project. 
    Scope of Work 
    The objectives of the Services are to develop technical specification for the RI-AMS for 
    Railway Infrastructure company and support the company during RI-AMS procurement and 
    implementation. This will be achieved through: (1) state-of-the-art analysis of the existing RI-
    AMS environment at IZS and propose necessary intervention for its improvements; (2) 
    through needs assessment with recommendations for necessary improvements of RI-AMS 
    practices and a roadmap for RI-AMS rolling out with corresponding action plan, timelines, 
    cost estimation and clear responsibilities; (3) development of Technical Specifications for the 
    implementation of the RI-AMS system, and (5) provision of support to the Railway 
    Infrastructure company in procurement and RI-AMS implementation stage. 
    The Scope of Work is divided into two Components: 
    • 
    Component 1: RI-AMS Design stage that includes Activities from 1 to 5 which will be 
    performed as Lump Sum payments with milestones against submission of deliverables 
    and, 
    • 
    Component 2: RI-AMS Procurement and Implementation stage that includes Activity 
    6 which will be performed as Time Based payments with periodic payments against 
    time actually spent on the services. 
    
    2 
    
    Component 1 assumes the following activities: 
    • 
    Activity 1: Inception 
    • 
    Activity 2 Analysis of the current State-of-Play and State-of-Practice 
    • 
    Activity 3: Rail Asset Management Needs assessment and roadmap for introduction 
    of fully functioning road asset management system 
    • 
    Activity 4: Preparation of Implementation plan and Technical Specifications for RI-
    AMS 
    • 
    Activity 5: RI-AMS Trainings 
    Component 2 assumes the following activities: 
    • 
    Activity 6: Procurement and Implementation supervision support 
    Contract duration for both Components: 24 months starting from the commencement 
    date. 
    The detailed Terms of Reference for the above referenced consulting services is posted on 
    the website of the Ministry of Construction, Transport and Infrastructure (MoCTI) 
    https://mgsi.gov.rs/cir/dokumenti/serbia-railway-sector-modernization-project-srsm-rail-
    infrastructure-asset-management 
    The Central Fiduciary Unit (CFU) of the Ministry of Finance now invites eligible Consultants 
    to indicate their interest in providing the Services. Interested Consultants should provide 
    information demonstrating that they have the required qualifications and relevant experience 
    to perform the Services. 
    The Consultant firm will be selected in accordance with QCBS (Quality and Cost Based 
    Selection) method set out in the World Bank’s Procurement Regulations for IPF Borrowers 
    (July 2016, revised November 2017, August 2018 and November 2020). 
    The assignment will require a qualified consulting company or consortium that can 
    demonstrate extensive experience in Technical assistance service for the contract. 
    The following shortlisting criteria will be applied to a
Tekst objave
SERBIA RAILWAY SECTOR MODERNIZATION PROJECT (SRSM) - Rail Infrastructure Asset Management System (CONUSLTING SERVICES)

Dokumenti: 

SER SRSM_QCBS-CS-21-22 _REoI Techical Advisory RiAMS_08082022_EXTENSION of TIME.pdf

SER SRSM_QCBS-CS-21-22 _REoI Techical Advisory RiAMS_18072022.pdf